Figure 10 - Strategic Road Network – England (Source: HA 2012)<br />

6.5 The Highways Agency Regional Network Report (2008) identifies congestion on the<br />

SRN as a particular concern in the South East region, and it is stated that congestion is<br />

expected to increase along with the growth in road-based freight and commuting. In<br />

<strong>Runnymede</strong> itself, the stretch of motorway between junction 1A and 16 off the M25 is<br />

identified as one of the less transport-efficient parts of the SRN in the South East. This<br />

stretch of motorway as well as the stretch of motorway between junctions 2 and 4 of<br />

the M3 (part of which runs through <strong>Runnymede</strong>) were identified as having high daily<br />

stress levels in 2006.<br />

Page | 49<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!