of works within the context of a 100 year strategic plan. The LTFRMS will reduce the<br />

risk of river flooding to 15,000 properties with a one per cent annual (1 in 100 year)<br />

chance of flooding from Datchet to Teddington. Measures proposed in the strategy<br />

include:<br />

• building three flood diversion channels (Channel 1 would run from Datchet to<br />

Wraysbury; Channel 2 from Egham to Chertsey and Channel 3 from Chertsey<br />

to Shepperton)<br />

• widening or deepening of the Des<strong>Borough</strong> Cut<br />

• capacity increases to Sunbury, Molesey, and Teddington weirs<br />

• Individual property protection measures for improving resistance against<br />

flooding for smaller groups of properties<br />

• improving mapping information for emergency evacuation plans<br />

13.56 Specifically, within Chertsey, both local and combined flood impacts from the Chertsey<br />

Bourne and the River Thames are known to be significant. There are numerous<br />

tributaries and minor drainage channels in the area and many would receive some<br />

reduction in flood risk due to the proposed diversion channels, which would reduce<br />

flood levels generally. The Chertsey Bourne system, incorporating the Mead Lake Ditch<br />

and Moat, has been assessed as receiving significant benefits from diversion Channel<br />

2. A previous study into the flooding impacts of the Chertsey Bourne was included into<br />

the wider Lower Thames Strategy.<br />

13.57 In regard to the community based measures for improving resistance against flooding<br />

for smaller groups of properties, within the <strong>Borough</strong>, the Environment Agency have<br />

assessed a number of properties in Timsway, Coopers Close and Staines Lane (all in<br />

Staines). Work was carried out to identified properties in 2012 following survey reports<br />

carried out by the Environment Agency for the residents.<br />

13.58 Given the difficulties with securing the funding for the project however (for more<br />

information on this please see the ‘costs and funding sources’ section below), works<br />

will be delivered through separate projects. According to the Environment Agency,<br />

works are unlikely to start in 2017 as originally stated. During the Local <strong>Plan</strong> period, it is<br />

only the individual property protection works proposed under the LTFRMS which will be<br />

carried out in <strong>Runnymede</strong>. The civil works and cut works are planned to take place<br />

after 2026.<br />

13.59 The River Wey Flood Risk Management Strategy which was previously proposed has<br />

now largely been abandoned although the Environment Agency advise that they are<br />

continuing their work on the refurbishment of the weirs along the route.<br />

Costs and funding sources<br />

13.60 The Whole Life Cost (excluding inflation) of the LTFRMS is £538m including a<br />

contingency of £101m. As a consequence of the Government’s 2010 Comprehensive<br />

Spending Review however, Defra has instructed the Environment Agency to reduce<br />

their capital expenditure by 27% by 2014. This has implications on the size of their<br />

capital programme and their proposed schemes. In June 2011, Defra introduced a new<br />

policy of Partnership Funding. This scheme enables a greater number of schemes to<br />

receive at least some capital funding, with the remaining amount being made up from<br />

external contributions. Fewer schemes will however receive 100% Defra Grant in Aid<br />

(GiA) funding.<br />

13.61 When the Environment Agency undertook the public consultation for the LTFRMS in<br />

2009, the scheme was eligible for 100% Defra funding, based on the strength of the<br />

business case. The change in policy means that the delivery of the LTS will now<br />

Page | 140<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>