• Increased IT costs, in infrastructure, hardware, licences, wi-fi, technical<br />
support and access to IT systems given the predicted increase in the overall<br />
population over the plan period and the push to use IT to access services.<br />
• Increased need for assistive technology, hardware (mobility assistance,<br />
physical impairment equipment, software- e.g. screen readers, magnification<br />
etc) given that the population is aging.<br />
• Rise of e-books and e-learning and increase in e-use by a generation who<br />
have grown up with it. Balance of library stocks and resources will shift to e-<br />
resources and e-books. Costs will increase because e-books and e-<br />
resources are more expensive than paper because of the licensing<br />
arrangements. 60% of stocks will be e-stocks which are 20% more expensive<br />
than paper.<br />
14.50 An additional branch library may be required to support the DERA development.<br />
Costs and funding sources<br />
14.51 Proposals to change the nature of the service delivery over the plan period have an<br />
emphasis on IT provision and electronic resources. This will not require the physical<br />
expansion of the existing libraries in the <strong>Borough</strong>. Instead improvements will be<br />
required to improve the quality and range of service, updating the current provision and<br />
reflecting the changing needs of the community.<br />
14.52 The main funding source for such changes for such changes over the plan period is<br />
considered to come from SCC. In addition however, community partnership libraries<br />
are also likely to rely on local fundraising and sponsorship. As with all public services,<br />
libraries in Surrey are facing budget cuts to meet the reduced level of revenue available<br />
from central Government. The impact of this is reflected in the position set out in the<br />
recommendations of the PVR review.<br />
14.53 Funding for specific projects is as follows:<br />
14.54 Library Direct: SCC estimates that the cost of this service over the plan period will be<br />
in the region of £333,765. The funding that SCC is able to contribute to this service<br />
over the same period is £216,690. This leaves a gap in funding of £117,075.<br />
14.55 IT provision and assistive technology in <strong>Runnymede</strong> libraries: SCC has confirmed<br />
that the cost of the IT project over the plan period would be £2,160,000. The funding<br />
that will be provided by SCC over this same period will be £1,635,000. This leaves a<br />
funding gap therefore of £525,000.<br />
14.56 Additional branch library at the DERA site: SCC has advised that if a new housing<br />
development generates a new community library, then for electrics, licencing, IT<br />
equipment, self service kiosks, printers etc, an additional £30,000 per annum would be<br />
required to support the library.<br />
Funding<br />
ID<br />
Description<br />
Estimated<br />
Cost<br />
Key<br />
Provider(s)<br />
IDPF151 Continuation of Library Direct service £333,765 SCC<br />
IDPF152<br />
IDPF153<br />
Improvement of IT provision and<br />
assistive technology in <strong>Runnymede</strong><br />
libraries<br />
Possible provision of an additional<br />
library to support the development at<br />
the former DERA site<br />
£2,160,000 SCC<br />
£30,000<br />
per annum<br />
SCC<br />
Page | 150<br />
<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>