• Increased IT costs, in infrastructure, hardware, licences, wi-fi, technical<br />

support and access to IT systems given the predicted increase in the overall<br />

population over the plan period and the push to use IT to access services.<br />

• Increased need for assistive technology, hardware (mobility assistance,<br />

physical impairment equipment, software- e.g. screen readers, magnification<br />

etc) given that the population is aging.<br />

• Rise of e-books and e-learning and increase in e-use by a generation who<br />

have grown up with it. Balance of library stocks and resources will shift to e-<br />

resources and e-books. Costs will increase because e-books and e-<br />

resources are more expensive than paper because of the licensing<br />

arrangements. 60% of stocks will be e-stocks which are 20% more expensive<br />

than paper.<br />

14.50 An additional branch library may be required to support the DERA development.<br />

Costs and funding sources<br />

14.51 Proposals to change the nature of the service delivery over the plan period have an<br />

emphasis on IT provision and electronic resources. This will not require the physical<br />

expansion of the existing libraries in the <strong>Borough</strong>. Instead improvements will be<br />

required to improve the quality and range of service, updating the current provision and<br />

reflecting the changing needs of the community.<br />

14.52 The main funding source for such changes for such changes over the plan period is<br />

considered to come from SCC. In addition however, community partnership libraries<br />

are also likely to rely on local fundraising and sponsorship. As with all public services,<br />

libraries in Surrey are facing budget cuts to meet the reduced level of revenue available<br />

from central Government. The impact of this is reflected in the position set out in the<br />

recommendations of the PVR review.<br />

14.53 Funding for specific projects is as follows:<br />

14.54 Library Direct: SCC estimates that the cost of this service over the plan period will be<br />

in the region of £333,765. The funding that SCC is able to contribute to this service<br />

over the same period is £216,690. This leaves a gap in funding of £117,075.<br />

14.55 IT provision and assistive technology in <strong>Runnymede</strong> libraries: SCC has confirmed<br />

that the cost of the IT project over the plan period would be £2,160,000. The funding<br />

that will be provided by SCC over this same period will be £1,635,000. This leaves a<br />

funding gap therefore of £525,000.<br />

14.56 Additional branch library at the DERA site: SCC has advised that if a new housing<br />

development generates a new community library, then for electrics, licencing, IT<br />

equipment, self service kiosks, printers etc, an additional £30,000 per annum would be<br />

required to support the library.<br />

Funding<br />

ID<br />

Description<br />

Estimated<br />

Cost<br />

Key<br />

Provider(s)<br />

IDPF151 Continuation of Library Direct service £333,765 SCC<br />

IDPF152<br />

IDPF153<br />

Improvement of IT provision and<br />

assistive technology in <strong>Runnymede</strong><br />

libraries<br />

Possible provision of an additional<br />

library to support the development at<br />

the former DERA site<br />

£2,160,000 SCC<br />

£30,000<br />

per annum<br />

SCC<br />

Page | 150<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!