13.01.2015 Views

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Type of<br />

infrastructure<br />

Component Sch ID Scheme<br />

Essential/<br />

desirable<br />

infrastructu<br />

re<br />

Indicative<br />

<strong>Delivery</strong><br />

Phasing<br />

Estimated<br />

Cost<br />

Funding<br />

Lead<br />

Organisation<br />

Contingency<br />

plan<br />

Perkins’s School campus School current form<br />

Education<br />

Secondary<br />

schools<br />

IDPF010<br />

Various extensions and<br />

alterations to TASIS<br />

campus<br />

From current<br />

time up to<br />

2015-2018<br />

Unknown Funded privately TASIS School would<br />

remain in<br />

current form<br />

Education<br />

Higher<br />

education<br />

IDPF013<br />

Growth on campus at<br />

RHUL (specific details of<br />

proposals unknown)<br />

Desirable<br />

Likely to come<br />

forward in<br />

phases over<br />

plan period<br />

Unknown<br />

RHUL and its<br />

partners<br />

RHUL<br />

The campus<br />

would remain<br />

in its current<br />

form. This<br />

would limit<br />

the growth<br />

plans of the<br />

University.<br />

Education<br />

Further<br />

education<br />

IDPF012<br />

Various works to Strodes<br />

College following 2010<br />

planning consent<br />

Desirable<br />

Permission<br />

implemented<br />

Unknown Unknown Unknown If funding<br />

cannot be<br />

sourced, the<br />

drama studio<br />

will not be<br />

built.<br />

Transport<br />

Non<br />

strategic<br />

Highway<br />

network<br />

IDPF014<br />

Works to the <strong>Runnymede</strong><br />

Roundabout<br />

Essential<br />

Indicative<br />

construction<br />

start-2015<br />

£5million<br />

SCC/ S.106/ RBC<br />

/ Regional<br />

infrastructure<br />

funding/ LEP<br />

Surrey<br />

County<br />

<strong>Council</strong>/<br />

RBC<br />

Roundabout<br />

would remain<br />

as at present<br />

Transport<br />

Non<br />

strategic<br />

highway<br />

network<br />

IDPF015<br />

Highway improvements at<br />

Egham High<br />

Street/Church Road,<br />

Egham (specifically,<br />

provision of 2 new bus<br />

Essential By 2015 £150,000 Developer<br />

contributions<br />

Surrey<br />

County<br />

<strong>Council</strong><br />

It should be<br />

notified that<br />

to deliver this<br />

scheme,<br />

additional<br />

Page | 171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!