13.01.2015 Views

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

consultation at each stage of production of the document (see the <strong>Council</strong>’s Statement<br />

of Consultation for further information in this regard). There will be continued<br />

discussions with infrastructure providers to inform the IDP and ensure that it is kept<br />

accurate and up to date over the plan period. As discussed, the <strong>Council</strong> is committed to<br />

putting strong governance arrangements in place to ensure that this is achieved.<br />

15.15 This is the first IDP prepared for <strong>Runnymede</strong> The baseline position in this IDP will allow<br />

RBC and its partners to prioritise investment decisions and address funding gaps over<br />

the lifetime of the Local <strong>Plan</strong>. The IDP is a live document which will be regularly<br />

updated over the lifetime of the Local <strong>Plan</strong>. The <strong>Infrastructure</strong> Schedule should be read<br />

alongside the IDP and is also a live document which will be reviewed and updated over<br />

the plan period. It is likely that the updating of the schedule will go hand in hand with<br />

the updating up the IDP as the two documents are intrinsically linked.<br />

Page | 166<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!