13.01.2015 Views

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 14- SHMA Population Age Projections 2006 - 2021<br />

80.0%<br />

75.0%<br />

% Age Population Change 2006-2021<br />

70.0%<br />

60.0%<br />

50.0%<br />

40.0%<br />

30.0%<br />

20.0%<br />

10 .0 %<br />

34.1%<br />

21.4%<br />

21.1%<br />

29.1%<br />

16 .1%<br />

6.3% 7.3% 16 .7%<br />

13 .7%<br />

40.6%<br />

38.5%<br />

33.3%<br />

31.0%<br />

23.3%<br />

9.3% 10 .2 % 0.0%<br />

0.0%<br />

6.27 Parts of the existing non strategic road network within the <strong>Borough</strong> are known to<br />

experience problems at the current time. According to information 19 supplied by Surrey<br />

County <strong>Council</strong>, between 1st January 2009 and 29th <strong>Feb</strong>ruary 2012, the non-strategic<br />

road network contained 8 cluster sites for traffic accidents. These were:<br />

• A320 Guildford Road Junction St Peters Way, Chertsey (10 accidents over<br />

analysis period)<br />

• A318 Chertsey Road Junction Green Lane, Addlestone (12 accidents over<br />

analysis period)<br />

• A320 St Peters Way at M25, Junction 11 (36 accidents over analysis period)<br />

• A317 Addlestonemoor roundabout, Addlestone (20 accidents over analysis<br />

period)<br />

• A30 London Road Junction with Blacknest Road, Virginia Water (8 accidents<br />

over analysis period)<br />

• A30 London Road Junction St Judes Road/Bakeham Road, Egham (13<br />

accidents over analysis period)<br />

• A308 The Causeway Junction with Staines Bridge, Staines (15 accidents<br />

over analysis period)<br />

• A30 Egham by pass junction with <strong>Runnymede</strong> Roundabout, Egham (By-pass<br />

and The Avenue arms only) (10 accidents over analysis period)<br />

6.28 On the A318, A320 and A30 by pass (junction with <strong>Runnymede</strong> Roundabout), it is<br />

considered reasonable to assume that the high number of accidents could correlate<br />

with the particularly problematic 20 ‘traffic volume over capacity (V/C) ratios’ as reported<br />

19<br />

Criteria = 3 or more injury collisions in last year, then extended analysis for 3 years to date.<br />

20<br />

Problematic in terms of severe queuing and delays to motorists.<br />

Page | 56<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!