Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
expected in the <strong>Borough</strong> up to 2026. Development would largely be focussed in the<br />
<strong>Borough</strong>’s Urban Areas, although the redevelopment of the former DERA site in<br />
Longcross is likely to be a specific consideration for the Police, as the development<br />
would substantially increase the population on the western side of the <strong>Borough</strong>.<br />
13.11 Strategic Policy 6 (SP06) which supports, promotes and encourages tourism,<br />
recreation and leisure provision within the <strong>Borough</strong>, and Strategic Policy 10 (SP10)<br />
which is concerned with development and flood risk are also considered to be relevant<br />
in this case as both flooding events and an increase in the number of tourists attracted<br />
to the <strong>Borough</strong> would no doubt impact on existing police resources.<br />
13.12 In terms of the new development proposed in the <strong>Borough</strong> over the plan period,<br />
Strategic Policy 5 (SP05) (which is concerned with design) is considered to be relevant,<br />
stating that proposals for new development should create safe and secure<br />
environments. Secured by Design and Safer Places: The <strong>Plan</strong>ning System and Crime<br />
Prevention provide further guidance in this regard. It is considered reasonable to<br />
assume that creating safe and secure developments which reduce opportunities for anti<br />
social behaviour would be welcomed by Surrey Police.<br />
Future provision<br />
13.13 Central Government Police funding will reduce by 20% in real terms by 2014-15. This is<br />
following the Government’s October 2010 Spending Review. Although in 2011, Surrey<br />
was the only Force in the country to increase officer numbers, recruiting 200 additional<br />
Police Constables.<br />
13.14 Surrey Police has undertaken some work to assess future demands on the service<br />
resulting from population changes and proposed housing development. This has been<br />
based on ONS 2006 mid-year estimates and dwelling-based projections based on the<br />
South East <strong>Plan</strong>. Whilst the South East <strong>Plan</strong> figures for housing growth in the <strong>Borough</strong><br />
correlate with the 161 units which are proposed to be delivered in the draft Local <strong>Plan</strong>,<br />
as noted in chapter 6 of this report, it is possible that over the plan period, a greater<br />
number of units could come forward per annum.<br />
13.15 Surrey Police has stated that the increase in population and households forecasted<br />
across the County in the coming years is likely to have significant impacts on staffing<br />
and transport resources 38 . The exact demands of the predicted growth on the police<br />
force are however hard to predict as this is dependent on a range of factors including<br />
the type and location of dwellings built. Surrey Police advise that it is considered that<br />
development in North Surrey, Western Corridor and Dunsfold is most likely to have a<br />
significant impact on the demand for their services.<br />
13.16 Whilst <strong>Runnymede</strong> is located in North Surrey however, the Surrey <strong>Infrastructure</strong><br />
Capacity Project Phase 1 Final Report, June 2009 shows that at the time of writing,<br />
both Addlestone and Egham Police Stations had spare capacity (in terms of facilities).<br />
Egham Police Station is now for sale for redevelopment.<br />
13.17 A number of Closed Circuit television (CCTV) cameras exist in the <strong>Borough</strong> to assist<br />
with the prevention of, and tackling of crime and disorder. The <strong>Council</strong>’s Community<br />
Safety Manager has confirmed that a number of the cameras in the <strong>Borough</strong> will<br />
require either upgrading or replacing over the plan period (it should be noted that the<br />
cameras only have a 3 year life span).<br />
38<br />
Surrey <strong>Infrastructure</strong> Capacity Project Phase 1 Final Report, June 2009 <br />
Page | 130<br />
<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>