18.04.2015 Views

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SHRP 2 L11: Final Report<br />

Table 6.7 Level 1 <strong>Strategies</strong> (Delay Reduction of up <strong>to</strong> 50%)<br />

Category Strategy Treatments<br />

2.Information<br />

Collection and<br />

Dissemination<br />

4. Incident and<br />

Special Event<br />

Management<br />

5.<br />

Infrastructure<br />

<strong>Improve</strong>ments<br />

and Demand<br />

Optimization<br />

2.3.Pre-trip<br />

Information<br />

4.1.Preevent<br />

4.2.Postevent<br />

5.3.Signal<br />

Timing/ ITS<br />

5.6.<br />

Congestion<br />

Pricing<br />

National<br />

Traffic and<br />

Road Closure<br />

Information<br />

Service<br />

Patrols<br />

On-Scene<br />

Incident<br />

Management<br />

(Incident<br />

Responder<br />

Relationship,<br />

High visibility<br />

garments,<br />

Clear Buffer<br />

zones,<br />

Incident<br />

Screens)<br />

Work Zone<br />

Management<br />

Transportation<br />

Management<br />

Center (TMC)<br />

Traffic<br />

Adaptive<br />

Signal Control/<br />

Advanced<br />

Signal<br />

Systems<br />

Electronic Toll<br />

Collection<br />

(ETC)<br />

Application<br />

<strong>to</strong> Sources<br />

of<br />

Congestion<br />

Weather,<br />

Work Zones<br />

Traffic<br />

Incidents<br />

Traffic<br />

Incidents<br />

Work Zones<br />

Traffic<br />

Control<br />

Devices,<br />

Special<br />

Events,<br />

Weather,<br />

Work Zones,<br />

Traffic<br />

Incidents<br />

Traffic<br />

Control<br />

Devices<br />

Physical<br />

Bottlenecks<br />

Key Quantitative<br />

Benefits<br />

Reduces delays<br />

(early and late<br />

arrivals) by 50%<br />

Can reduce<br />

incident response<br />

by 19% <strong>to</strong> 77%<br />

and incident<br />

clearance time by 8<br />

min.<br />

Traffic incident<br />

management<br />

programs have<br />

reported reductions<br />

in incident duration<br />

from 15 <strong>to</strong> 65<br />

percent<br />

Reduces work zone<br />

related delays by<br />

50% <strong>to</strong> 55%<br />

Reduces delay by<br />

10% <strong>to</strong> 50%<br />

Adaptive signal<br />

control systems<br />

have been shown<br />

<strong>to</strong> reduce peak<br />

period travel times<br />

6-53%.<br />

Electronic Toll<br />

Collection (ETC)<br />

reduces delay by<br />

50% for manual<br />

cash cus<strong>to</strong>mers<br />

and by 55% for<br />

au<strong>to</strong>matic coin<br />

machine<br />

cus<strong>to</strong>mers, and<br />

increases speed by<br />

57% in the express<br />

lanes.<br />

Overall Cost<br />

Range*<br />

Effective<br />

ness-<br />

Cost<br />

Rank<br />

Low-Medium 1-B<br />

High 1-E<br />

Low 1-A<br />

Variable<br />

(depends if<br />

infrastructure is<br />

added or not)<br />

OPERATIONS STRATEGIES AND TREATMENTS TO IMPROVE TRAVEL-TIME RELIABILITY Page 79<br />

1-D<br />

High 1-E<br />

Medium-High 1-C<br />

High 1-E<br />

Notes: Overall Cost Range* : Low - 200K but < 1 million<br />

High - >1 million<br />

* Overall Cost Range applies <strong>to</strong> the application of a treatment in roadway segment or corridor. For example, several DMS can be<br />

installed along an important route.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!