18.04.2015 Views

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SHRP 2 L11: Final Appendices<br />

<strong>Time</strong> of Day<br />

Table B.2 - Illustrative Option Calculation for an Urban Freeway<br />

Average Annual<br />

Speed (mph)<br />

Log Average Annual<br />

Speed<br />

Std Dev Log<br />

Speed<br />

Option Value<br />

(mph)<br />

Option Value (minutes per<br />

mile)<br />

14:00 57.11 4.02 0.25 5.64 0.115<br />

14:05 56.56 4.01 0.29 6.49 0.137<br />

14:10 55.16 3.95 0.42 9.25 0.219<br />

14:15 53.78 3.92 0.43 9.14 0.228<br />

14:20 52.52 3.89 0.45 9.34 0.247<br />

14:25 51.08 3.84 0.50 10.09 0.289<br />

14:30 50.81 3.84 0.48 9.69 0.278<br />

14:35 50.01 3.81 0.51 10.16 0.306<br />

14:40 48.02 3.76 0.53 10.10 0.333<br />

14:45 46.31 3.71 0.57 10.37 0.374<br />

14:50 45.03 3.67 0.59 10.47 0.404<br />

14:55 43.64 3.63 0.60 10.24 0.422<br />

15:00 41.52 3.57 0.61 9.92 0.454<br />

15:05 41.11 3.55 0.63 10.19 0.481<br />

15:10 39.47 3.49 0.66 10.21 0.530<br />

15:15 37.48 3.42 0.68 10.00 0.582<br />

15:20 35.79 3.38 0.67 9.39 0.596<br />

15:25 34.15 3.32 0.67 8.97 0.626<br />

15:30 33.69 3.31 0.67 8.80 0.630<br />

15:35 33.93 3.32 0.66 8.75 0.615<br />

15:40 32.68 3.28 0.67 8.54 0.650<br />

15:45 29.00 3.15 0.67 7.59 0.734<br />

15:50 26.30 3.05 0.64 6.64 0.771<br />

15:55 24.67 3.00 0.63 6.06 0.791<br />

16:00 23.16 2.94 0.61 5.53 0.812<br />

16:05 23.10 2.94 0.60 5.42 0.796<br />

Source: Counter data at I-405/I-90, South Bound, 2007. The calculations apply a guarantee<br />

equal <strong>to</strong> the average speed for each time of day.<br />

As previously stated, the data in Table B.2 are illustrative. They are provided <strong>to</strong> show the option<br />

values associated with varying speeds and log-variability on a facility. In this table, the average<br />

speed, log average speed, and the standard deviation are calculated from observed speed data. The<br />

option value (mph) is calculated from the average log speed and log standard deviation calculated<br />

from the data and the other inputs <strong>to</strong> the options formulation previously described using Equation<br />

1.<br />

Using Equation 1, the option value will be expressed in the speed reduction that drivers would be<br />

willing <strong>to</strong> accept <strong>to</strong> obtain their speed guarantee. The option value, expressed in mph can be<br />

converted <strong>to</strong> minutes by subtracting the option value in speed from the speed guarantee and<br />

determining the additional average travel time the road user is willing <strong>to</strong> accept in exchange for<br />

travel-time reliability.<br />

DETERMINING THE ECONOMIC BENEFITS OF IMPROVING TRAVEL-TIME RELIABILITY Page B-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!