SHRP 2 L11: Final Appendices<br />

Notes:<br />

* Overall Cost Range applies <strong>to</strong> the application of a treatment in roadway segment or corridor. For example, several DMS can be installed along a important<br />

route.<br />

**Unit costs were found by adding the unit cost of different equipment for each treatment. This methodology does not apply <strong>to</strong> all treatments (e.g., TMC,<br />

Integrated Multimodal Corridors, etc.)<br />

References:<br />

1. Rita ITS Database - http://www.itsoverview.its.dot.gov/. Accessed November 19, 2009<br />

2 Robert P. Maccubbin, Barbara L. Staples, Firoz Kabir, Cheryl F. Lowrance, Michael R. Mercer, Brian H. Philips, Stephen R. Gordon. Intelligent<br />

Transportation Systems Benefits, Costs, Deployment, and Lessons Learned: 2008 Update. FHWA-JPO-08-032. Sep., 2008.<br />

3. Hadi, M. and Sinha, P. Intelligent Transportation System Deployment Analysis System Cus<strong>to</strong>mization: Technical Memorandum No.4 - Florida-Specific<br />

Intelligent Transportation System Deployment Costs. Florida DOT, Traffic Engineering and <strong>Operations</strong> Office, ITS Section. Aug., 2005<br />

Strategy: 4.1. Pre-event<br />

Category: 4. Incident and Special Event Management<br />

Treatments and Impacts<br />

Overall Cost Range*<br />

Low - 200K but < 1<br />

million<br />

High - >1 million<br />

(Unit)** Capital Cost ($K)<br />

(Unit)** Operation<br />

Cost/year ($K/yr)<br />

Low High Low High<br />

Service Patrols High N/A N/A 810 990<br />

General Cost Info (1, 2, 3)<br />

- Operating a freeway service patrol program cost $2.4<br />

million for 2005 in Southeast Michigan.<br />

- Colorado DOT launches service patrol program<br />

along I-70; 2005 operating costs are $1.5 million.<br />

Notes:<br />

* Overall Cost Range applies <strong>to</strong> the application of a treatment in roadway segment or corridor. For example, several DMS can be installed along a important<br />

route.<br />

**Unit costs were found by adding the unit cost of different equipment for each treatment. This methodology does not apply <strong>to</strong> all treatments (e.g., TMC,<br />

Integrated Multimodal Corridors, etc.)<br />

References:<br />

1. Rita ITS Database - http://www.itsoverview.its.dot.gov/. Accessed November 19, 2009<br />

2 Robert P. Maccubbin, Barbara L. Staples, Firoz Kabir, Cheryl F. Lowrance, Michael R. Mercer, Brian H. Philips, Stephen R. Gordon. Intelligent<br />

Transportation Systems Benefits, Costs, Deployment, and Lessons Learned: 2008 Update. FHWA-JPO-08-032. Sep., 2008.<br />

3. Hadi, M. and Sinha, P. Intelligent Transportation System Deployment Analysis System Cus<strong>to</strong>mization: Technical Memorandum No.4 - Florida-Specific<br />

Intelligent Transportation System Deployment Costs. Florida DOT, Traffic Engineering and <strong>Operations</strong> Office, ITS Section. Aug., 2005<br />

COST INFORMATION OF TRAVEL-TIME RELIABILITY STRATEGIES Page G-8