18.04.2015 Views

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

Evaluating Alternative Operations Strategies to Improve Travel Time ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SHRP 2 L11: Final Appendices<br />

The following information was obtained in an effort <strong>to</strong> summarize the current activities by public<br />

agency programs and private entity sources regarding travel time reliability:<br />

Washing<strong>to</strong>n State DOT (WSDOT)<br />

The Gray Notebook is WSDOT’s main performance assessment, reporting, and communication<br />

<strong>to</strong>ol. The Gray Notebook (http://www.wsdot.wa.gov/accountability/default.htm) provides quarterly, in-depth reports<br />

on agency and transportation system performance. The purpose of the Gray Notebook is <strong>to</strong> keep<br />

WSDOT accountable <strong>to</strong> the Governor, the Legislature, Washing<strong>to</strong>n State citizens, and<br />

transportation organizations.<br />

Included in the Gray Notebook is the Performance Dashboard, which is an overview of the key<br />

performance indica<strong>to</strong>rs for each of the policy goals. The Performance Dashboard shows the current<br />

and previous performance mark for each measure. It indicates which way the program is trending,<br />

and why. Five policy goals/performance measures are included in the Performance Dashboard:<br />

safety, preservation, mobility/ congestion relief, environment, and stewardship. The only measures<br />

related <strong>to</strong> travel time reliability are included under the mobility/congestion relief policy goal as<br />

follows:<br />

• Average Clearance time (in minutes) for major (90+ minute) incidents on key Puget<br />

Sound corridors; and<br />

• Annual weekday hours of delay statewide on highways compared <strong>to</strong> maximum<br />

throughput (51 MPH) in thousand hours.<br />

Georgia Regional Transportation Authority (GRTA)<br />

The Georgia Regional Transportation Authority (GRTA) produces an annual report, titled the<br />

Transportation Metropolitan Atlanta Performance (MAP) Report, which reports on the region’s<br />

progress <strong>to</strong>ward improving Mobility, Transit Accessibility, Air Quality, and Safety.<br />

Included in the Transportation MAP Report are the following mobility measures <strong>to</strong> track highway<br />

mobility:<br />

• Freeway <strong>Travel</strong> <strong>Time</strong> Index – The <strong>Travel</strong> <strong>Time</strong> Index (TTI) is the ratio of the average<br />

travel time over the free-flow travel time obtained for a certain portion or segment of<br />

the freeway system. For this report, measurements were created using GDOTs<br />

NaviGa<strong>to</strong>r video detection cameras.<br />

• Freeway Planning <strong>Time</strong> Index - Two travel time reliability measures are reported:<br />

the planning time index (PTI) and the buffer time index (BTI). Measurements for the<br />

planning time index were created using GDOTs NaviGa<strong>to</strong>r video detection cameras,<br />

similar <strong>to</strong> the freeway travel time index.<br />

o PTI is the ratio of the 95 th percentile travel time, also known as planning time, over<br />

the free-flow travel time obtained for a certain portion or segment of the freeway<br />

system. In other words, PTI tells a traveler how much longer it is going <strong>to</strong> take <strong>to</strong><br />

make a trip under congested conditions compared <strong>to</strong> free-flow conditions - so that<br />

the traveler arrives on-time 95 percent of the time.<br />

o BTI is defined as the difference between the 95 th percentile travel and the average<br />

travel time. BTI is the size of the buffer time expressed as a percentage of the<br />

average travel time and obtained for a segment of the freeway system. In other<br />

words, BTI tells a traveler the extra time as a percentage of the average travel time<br />

RELIABILITY PERFORMANCE MEASURES AVAILABLE TO AGENCIES Page A-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!