11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(v)Whether CRC/BRC coordinators have beengiven task of verifying 5% of the datacollected? Have they been oriented/trained forthis? If so when? How are they discharging thisresponsibility? Has the SPO also engagedindependent/third party to verify the data? Ifso, please give details, including findings. ?102In<strong>format</strong>ion to be obtained from SPO/DPO andcross checked during the Field visit by MI toBRCs/CRCs and schools.The teachers have been trained to fill up DCF, CRC/BRC coordinators have been trainedto collect 5% of the data and completed data is passed on to state by DPO. The coordinatortraining was held at BRC of each block. It was one day orientation training. SPO hasinvolved monitoring institution as a third party to verify the data.(vi)Whether the data collected and compiled bythe DPO was passed on to the State well in timei.e. by November?In<strong>format</strong>ion to be obtained from DPO and SPO.DPO states that it is passing TOTAL SCHOOL REPORT quarterly well in time.(vii)Is there an MIS in charge at State level? Is hefully conversant with needs of SSA in MIS?How many workshops/trainings has heattended in GOI/NIEPA?No in<strong>format</strong>ion is provided by SPOIn<strong>format</strong>ion to be obtained from SPO.(l) Research and Evaluation:(i)The number of Research to be undertakenduring the current financial year district-wiseand the actual number of research sanctioned.In<strong>format</strong>ion to be obtained from the SPO andto be updated from the DPO.In the district of Aurangabad neither any research was sanctioned during previous year(2007 – 08) nor was any research undertaken during current financial year (2008 –09).(ii)The number of studies sanctioned in theprevious calendar year and the number of themcompleted.No study was sanctioned in the previous calendar year.In<strong>format</strong>ion to be obtained from the SPO andto be updated from the DPO.(iii)Is there a Research/Evaluation in-charge atSPO level? What is the person’s role? What isthe system of coordination on research issuesboth SCERT/SIEMAT/DIETs etc? What is themechanism for sanction of research proposalsand projects? Is there a State Level Committeefor the purpose? Is there a prescribed contract<strong>format</strong> for commissioning of research?Coordination with DIET is limited only to conduct training.In<strong>format</strong>ion to be obtained from SPO.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!