11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(xli)Sample check by MI, of civil works in a district, sothat each category of civil works is covered in thesamples to verify actual status by visiting theconstruction site and variance if any, betweenreporting and actual may be indicated.118To be checked on the spot with assistance ofVEC/SMC and School Teachers.MI representative found that out of 76 new school buildings including spill over targeted forconstruction, construction of 54 (71%) school buildings were complete till December, 2008.There was a target to construct 62 ACRs, 74 toilets and 11 BRCs in the current financialyear.. The status of construction in different components are given below:Constructionofsanctioned complete Work in progress Yet to startFoundation LintelRoofingBuilding 76 54 (71%) 2 4 9 7 (9.2%)ACR 62 36 (58%) 2 5 6 13 (20.9%)Toilet 74 40(54%) 0 4 4 26 (35%)BRC 11 2 (18.18%) 0 0 0 9 (81.9%)CRC 20 11 (55%) 0 0 0 9 (45%)(xlii)(xliii)(xliv)(xlv)(xlvi)Whether SMC/VEC has been trained by technicalpersons for execution of civil work?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).53.5% of the sampled school in Nawada have reported that the VSS members have beentrained by technical persons for execution of civil work.Whether community manual for civil works has beenprepared and is available with VEC/SMC?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).34.7% schools have reported that they have prepared community manual for civil works andit is available with VSS membersIn the school buildings being constructed (newschools as well as building less schools), whether aramp is being constructed?In 26 (25.7%) sampled schools ramp has been constructed.Is VEC/SMC keeping a separate account of fundsand materials for construction?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).By physical verification by the MI in respect ofconstruction sites visited (sample as in (ii)above).M I has found that in 32 schools (31.7%) a separate account of funds and material forconstruction is maintained while in 69 schools (68.3%) separate account of funds forconstruction is not maintained.Who is designated for Technical Supervision for civilworks? What level (Block/District/Sub-District)?To be obtained from the SPO/DPO and thenverified on the field with VEC/SMC and SchoolTeachers (sample as in (ii) above).In 5 schools (5%) Assistant Engineer is the technical supervisor who are working at districtlevel while in 79 schools (78.2%) Junior Engineer is designated for technical supervision ofcivil work who are working at block level.(xlvii)The number of times the technical person visited theconstruction site and guided the constructionprocess? Did he visit at the foundation stage, linteland roof stage?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!