11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(xxix)(xxx)(xxxi)(xxxii)(xxxiiiWhether SMC/VEC has been trained by technicalpersons for execution of civil work?87To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).56.7% of the sampled school in Jahanabad reported that the VSS members have beentrained by technical persons for execution of civil work.Whether community manual for civil works has beenprepared and is available with VEC/SMC?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).52.2% of schools have reported that they have prepared community manual for civil worksand it is available with VSS members.In the school buildings being constructed (newschools as well as building less schools), whether aramp is being constructed?In 42 (46.7%) of the sampled schools ramp has bee constructed.Is VEC/SMC keeping a separate account of fundsand materials for construction?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).By physical verification by the MI in respect ofconstruction sites visited (sample as in (ii)above).M I has found that in 33 schools (36.7%) separate account of funds and material forconstruction is maintained while in 71 schools (63.4%) separate account of funds forconstruction is not maintained.Who is designated for Technical Supervision for civilworks? What level (Block/District/Sub-District)?To be obtained from the SPO/DPO and thenverified on the field with VEC/SMC and SchoolTeachers (sample as in (ii) above).In 13 schools (14.4%) Assistant Engineer is the technical supervisor who is working atdistrict level while in 67 school (74.4%) Junior Engineer is designated for technicalsupervision of civil work who are working at block level.(xxxiv(xxxv)(xxxviThe number of times the technical person visited theconstruction site and guided the constructionprocess? Did he visit at the foundation stage, linteland roof stage?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).Visit at foundation level: it was only once in 24 schools (26.7%), twice in 22 schools(24.4%), thrice in 6 schools, five times in 4 schools and 6 times in 3 schools.Visit at lintel level was only once in 7 schools, twice in 26 (28.9%) schools, thrice in 13schools, and 4 times in 12 schools (13.3%).Visit at roofing stage was only once in 8 schools (8.9%), twice in 15 schools (16.7%), thricein 11 schools (12.2%), 4 times in 13 schools (14.4%) and 5 times in 6 schools.Visit at completion stage was only once in 10 schools (11.1%), twice in12 schools (13.3%),thrice in 3 schools, 4 t5imes in 5 schools and 6 times in seven schools (7.8%).If there any convergence with Swajaldhara and TotalSanitation Campaign (TSC) taking place in respectof drinking water facilities provided in the schoolsvisited by MI? The quantum of funds utilised fromSwajaldhara and TSC and SSA in the sites visited?Status to be obtained from SPO updated at DPOin districts visited by MI. To be verified on thespot with assistance of VEC/SMC and SchoolTeachers (sample as in (ii) above).Only 5 schools (5.6%) there is a convergence of Svajaldhara and Total Sanitation Campaign(TSC).Whether construction of drinking water facilities inschools is being carried out by a specialized Agencyor VEC/SMC?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).In 59 school (65.6%) VSS is the water facilities constructing agency, in 31 schools (34.4%)any other agency is constructing water facilities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!