11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1163. District Level Half Yearly Monitoring Report(The Ministry/TSG needs district wise in<strong>format</strong>ion/observation as per the TOR 2008-2010using this <strong>format</strong> ,for each district separately, for the districts monitored by the MonitoringInstitution both for SSA and MDM tasks)3.1 Name of the District NAWADA3.2 Date of visit to the District/EGS/Schools 13 – 12 – 2008 to 22 – 12 – 20083.3 Tasks The Monitoring Institutes will obtain in<strong>format</strong>ion onthe following areas and include them in their report.(a) Opening of Schools (both primary and upper primary):(xxv)What is the number of schools sanctioned in thecurrent financial year in the state (including spill over)district wise and how many of them have been openeddistrict wise?In<strong>format</strong>ion is to be obtained from the StateProject office of SSA and to be updated by DPOin respect of the districts visited by MI.Out of 314 sanctioned schools (81 primaries and 233 upper primaries), 131 upper primaryschools opened only in the current year.(xxvi)Has the land for construction of the school beenidentified?In<strong>format</strong>ion to be obtained from DPO and samplecheck to be carried on the spot with the assistanceof VEC/SMC and School Teacher.For this year sanction, M.I. found that out of 17 new schools land has been identified for 15schools and work is in progress in 11 (64.7%) schools and work has to start in 6 schools.(xxviiWhether VEC/SMC etc. have received any funds forconstruction of the schoolIn<strong>format</strong>ion to be obtained from DPO and samplecheck to be carried on the spot with the assistanceof VEC/SMC and School TeacherThe VSS members of 70.6% of schools in Nawada have received funds for the construction ofschools released by DPO.Has the construction started and what is the stage ofconstruction (foundation, lintel and roofing etc.)?In<strong>format</strong>ion to be obtained from DPO and samplecheck to be carried on the spot with the assistanceof VEC/SMC and School Teacher.Out of 15 schools where construction work is going on 1 (5.9%) are at foundation level, 1(xxviii(5.9%) are at lintel level, 8 (47%) are at roofing stage and construction of 1 school is completedtill September 30,2008.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!