11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MI representative found that out of 12 new school building including spill over targeted forconstruction, construction of 7 (58.3%) school buildings were complete till December, 2008.there was a target to construct 158 ACRs 10 toilets and 3 BRCs in the current financial year.But none of them were completed till December, 2008. The status of construction indifferent components are given below:Constructionofsanctioned complete Work in progress Yet to startFoundation LintelRoofingBuilding 72 40 (55%) 5 4 8 15 (21%)ACR 52 29 (56%) 6 1 4 12 (23%)Toilet 75 51(68%) 10 1 1 12 (16%)BRC 4 3 (75%) 0 0 0 1 (25%)CRC 27 21 (78%) 0 1 1 4 (15%)19(iii)(iv)(v)(vi)(vii)Whether SMC/VEC has been trained by technicalpersons for execution of civil work?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).39.3% of the sampled school in Arangabad have reported that the VSS members have beentrained by technical persons for execution of civil work.Whether community manual for civil works has beenprepared and is available with VEC/SMC?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).35.7% schools have reported that they have prepared community manual for civil works andit is available with VSS membersIn the school buildings being constructed (newschools as well as building less schools), whether aramp is being constructed?In 35 (31.3%) sampled schools ramp has been constructed.Is VEC/SMC keeping a separate account of fundsand materials for construction?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).By physical verification by the MI in respect ofconstruction sites visited (sample as in (ii)above).M I has found that in 41 schools (36.6%) a separate account of funds and material forconstruction is maintained while in 71 schools (63.4%) separate account of funds forconstruction is not maintained.Who is designated for Technical Supervision for civilworks? What level (Block/District/Sub-District)?To be obtained from the SPO/DPO and thenverified on the field with VEC/SMC and SchoolTeachers (sample as in (ii) above).In 19 schools (17%) Assistant Engineer is the technical supervisor who are working atdistrict level while in 45 schools (40.2%) Junior Engineer is designated for technicalsupervision of civil work who are working at block level.(viii)(ix)The number of times the technical person visited theconstruction site and guided the constructionprocess? Did he visit at the foundation stage, linteland roof stage?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).19 schools have reported that the visit of technical supervisor was only one time, 6 schoolhave reported that the visit was twice. In 5 schools, visit was thrice, in 4 schools it was fourtimes, in another 5 schools it was more than 5 times.If there any convergence with Swajaldhara and TotalSanitation Campaign (TSC) taking place in respectof drinking water facilities provided in the schoolsvisited by MI? The quantum of funds utilised fromSwajaldhara and TSC and SSA in the sites visited?Status to be obtained from SPO updated at DPOin districts visited by MI. To be verified on thespot with assistance of VEC/SMC and SchoolTeachers (sample as in (ii) above).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!