11.07.2015 Views

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

Bihar - Jamia Millia Islamia _Final format_.pdf

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

As per DPO record 796 teaching post sanctioned for new school and all 796 posts filled up byappointment and all teachers have been put in position in new schools.In the schools visited by MI whether one-time grants ofRs. 10,000/- for Teaching and Learning equipments atprimary level and Rs. 50,000 per school at upperprimary level have been received by VEC/SMC? If yes,what items have been purchased for schools?Among 25 sampled new schools in Rohtas 60% of Primary schools have received one time(xxxixgrant of 10,000/- for TLE at primary level.(xl)147To be verified on the spot from the Bankpassbook of VEC/SMC etc. and expenditurestatement maintained by the school.Chairs, tables, repairing of old school building, purchasing dress for girls, hiring chairs forannual function, republic day celebration, independent day celebration, Books for library, BlackBoard, repairing/maintaining Boundary Wall, Almirah, Bell Dari, Boxes, and organizingtours/excursion for students etc.Whether any guidelines have been issued either bySPO and or DPO for the items to be provided for thenew school under this grant?Copy of circular/orders to be obtained from SPOand DPO. A copy of the instructions be enclosedalong with MI report.20% schools have reported that they have guideline with them circulated by DPO and they havefollowed the guideline strictly. On the other hand 75% schools have utilized it as per theirpriority of requirement.(b) Civil Works:(liii)(liv)What are the targets (including spillover) forconstruction of school buildings, additionalclassrooms, drinking water, toilets, BRCs/CRCs andother items like rain water harvesting etc. for thecurrent financial year and what is the progress tillthe previous quarter?In<strong>format</strong>ion is to be obtained from SPO alongwith district-wise break-up. SPO to furnish itemwiseprogress: completed works, works inprogress and works not started. To be updatedat the DPO for districts being visited by MI.The target was to construct 249 school building and 661 ACRs (including spillover). Out ofwhich construction of 249 school building (100%) and 581 ACRs (87.89%) have beencompleted. The work is in progress in 80 ACRs. A target was fixed to construct 04 toiletsbut 1 is completed. No target was fixed for construction of BRCs or CRCs.Sample check by MI, of civil works in a district, sothat each category of civil works is covered in thesamples to verify actual status by visiting theconstruction site and variance if any, betweenreporting and actual may be indicated.To be checked on the spot with assistance ofVEC/SMC and School Teachers.MI representative found that out of 26 new school building including spill over targeted forconstruction, construction of 16 (45.8%) school buildings were complete till December,2008. there was a target to construct 24 ACRs, 35 toilets, 2 BRCs and 9 CRCs in the currentfinancial year. The status of construction in different components are given below:Constructionofsanctioned complete Work in progress Yet to startFoundation LintelRoofingBuilding 26 16 (61%) 0 3 4 03 (11%)ACR 24 11 (45.8%) 0 2 4 7 (29%)Toilet 35 31(88.5%) 0 0 0 4 (11.4%)BRC 2 2 (100%) 0 0 0 01 (00%)CRC 9 7 (77.7%) 0 0 0 2 (22.2%)(lv)Whether SMC/VEC has been trained by technicalpersons for execution of civil work?To be verified on the spot with assistance ofVEC/SMC and School Teachers (sample as in(ii) above).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!