24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

28. New train operations allow to run the current train with interlocking or to terminate<br />

the current schedule of a train. These operations can be called automatically by<br />

contact indicators, by brake, stop, speed or action markers or by macros.<br />

29. Temporary speed limits can be set with a new train operation. See page 186.<br />

Dispatcher <strong>and</strong> Automatic Operation:<br />

30. The name of the blocks can be displayed, too, when edit mode is turned off.<br />

31. It is possible now to create more than one block diagram. See section 5.2, “Blocks<br />

<strong>and</strong> Routes”.<br />

32. The automatic calculation of the block diagram can involve more than one switchboard<br />

window. See section 5.2, “Blocks <strong>and</strong> Routes”. Due to this feature Train-<br />

Controller <strong>Gold</strong> is much better suited for large layouts than other versions of<br />

<strong>TrainController</strong> (including the <strong>Silver</strong> version), where the automatic calculation<br />

of the block diagram is always limited to a single switchboard.<br />

33. It is possible now to open more than one dispatcher windows at the same time. This<br />

is useful if you want to monitor different block diagrams simultaneously.<br />

34. The Passenger Ride comm<strong>and</strong> of the View menu causes the dispatcher window to<br />

follow the selected train as it moves across the layout. The block, in which the train<br />

is located at a time, will be automatically highlighted <strong>and</strong> displayed in the dispatcher<br />

window. If the train moves to another block diagram, then the display changes to<br />

this diagram, too.<br />

35. Connector symbols allow to link several switchboard windows or dispatcher windows<br />

to each other. See page 141. Connector symbols can also be used to create<br />

hidden track connections within the same switchboard or block diagram.<br />

36. With a new option it is possible to exclude those routes from the calculation of<br />

block diagrams, that contain too much turnouts. If two routes between the same<br />

two blocks contain a different number of turnouts <strong>and</strong> this difference exceeds a certain<br />

preset value, then the route with the higher number of turnouts is ignored. By<br />

using this option the calculated block diagrams will contain only routes with a minimum<br />

or accordingly higher number of turnouts.<br />

37. New speed markers provide more control of the location, where speed limits of the<br />

subsequent block are applied. See page 159<br />

38. New action markers allow to trigger operations easily at any location in a block<br />

without affecting the speed of the passing train. See page 160.<br />

39. The effect of all brake, stop, speed <strong>and</strong> action markers can be limited to specific<br />

trains. In this way it is very simple to let passenger <strong>and</strong> freight trains stop at different<br />

positions. Many other useful applications can be easily achieved, too. See page<br />

167.<br />

40. The effect of all brake, stop, speed <strong>and</strong> action markers can be limited to specific<br />

schedules. In this way it is very simple to let the same train stop at different posi-<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!