24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• The look ahead to select an optimal path out of several possible alternate paths is<br />

limited by the end of the current schedule in the sequence. This can improve the performance<br />

of the path selection, but may lead to selection of non-optimal paths.<br />

• Schedule sequences can be started in reverse direction, i.e. beginning with a destination<br />

block of the last schedule in the sequence end ending in a start block of the first<br />

schedule in the sequence.<br />

• During the change from one schedule of the sequence to the next certain minor limitations<br />

may apply with regard to calculation of block signal aspects <strong>and</strong> speed limits<br />

due to technical reasons.<br />

Schedule Successors:<br />

• Change of train is possible between two subsequent schedules in the chain of successor<br />

schedules.<br />

• Static linkage between a schedule <strong>and</strong> the subsequent schedules in the chain of successors.<br />

• Like schedule sequences the look ahead to select an optimal path out of several<br />

possible paths is limited by the end of the current schedule with the same consequences<br />

as with schedule sequences.<br />

• Chains of schedule successors cannot be started in reverse direction.<br />

• During the change from one schedule to a successor schedule without train change<br />

certain minor limitations may apply with regard to calculation of block signal aspects<br />

<strong>and</strong> speed limits due to technical reasons.<br />

Single long Schedules:<br />

• Change of train is not possible, until the schedule is terminated.<br />

• The look ahead to select an optimal path out of several possible alternate paths can<br />

take into account the complete path to the block, where the train will finally stop.<br />

This supports the selection of optimal paths at the expense of program performance.<br />

• Single schedules can be started in reverse direction, i.e. from a destination block to a<br />

start block.<br />

• Single schedules can be repeated as cycle or as shuttle train.<br />

196

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!