24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

!<br />

!<br />

With schedule successors it is possible to control a hidden yard automatically. A train<br />

arriving in a hidden yard can be enabled to select another waiting train, which will<br />

leave the hidden yard.<br />

If it is intended to start the successor with the same train, then it is recommended,<br />

that the successor starts with a destination block of the previous schedule. In this<br />

block the control of the train is transferred to the successor.<br />

If several schedules will be executed in a sequence, e.g. schedule 2 will be executed<br />

after schedule 1 <strong>and</strong> schedule 3 will be executed after schedule 2, then schedule 2 is<br />

to be specified as successor of schedule 1 <strong>and</strong> schedule 3 as successor of schedule 2.<br />

Since it is not possible to reverse a train or to change trains during the execution of a<br />

schedule successors must be used if<br />

• a train will be reversed<br />

• trains will be changed<br />

Schedule Sequences vs. Schedule Successors vs. Long Schedules<br />

Will complex train runs be specified as schedule sequences, as a chain of schedule successors<br />

or as one complex schedule? The answer to this question depends on the individual<br />

case <strong>and</strong> is also a question of personal taste.<br />

A train run, for example, that starts in the hidden yard of the block diagram displayed in<br />

Diagram 94, passes both blocks in “Southtown” <strong>and</strong> ends again in the hidden yard can<br />

be specified as a schedule sequence with three or four schedules, as a chain of schedule<br />

successors or as one big schedule which alternate paths in “Southtown”.<br />

These are the pros <strong>and</strong> cons of the particular approaches:<br />

Schedule Sequences:<br />

• Only available in <strong>TrainController</strong> <strong>Gold</strong>.<br />

• No change of trains is possible between two subsequent schedules in the sequence.<br />

• Usually used as a replacement for a single more complex schedule. Schedule sequences<br />

can be used to create a plurality of longer, more complex schedules by using<br />

several shorter, less complex schedules as building blocks.<br />

• No static linkage between a schedule <strong>and</strong> the subsequent schedule in the sequence.<br />

A schedule can precede different subsequent schedules in different schedule sequences.<br />

195

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!