24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Wire the analog turntable according to the instructions in the Help menu of<br />

<strong>TrainController</strong>.<br />

• A Turntable Window is created <strong>and</strong> the track layout of the turntable is configured<br />

accordingly.<br />

• Create a feedback indicator “Track 1” that is turned on, when the physical bridge<br />

of the turntable reaches the position of track 1. Of course you need an appropriate<br />

physical sensing device on your model railroad layout that is able to detect <strong>and</strong> report<br />

when the bridge reaches this position. This indicator is used to trigger stopping<br />

of the bridge at the destination position.<br />

• Create an on-off switch “Track 1”. This on-off switch is used to trigger turntable<br />

movement <strong>and</strong> to act as a memory in order to stop the bridge at the correct position.<br />

• Assign the move of the turntable bridge (in any direction) as operations to the onoff<br />

switch “Track 1”.<br />

• Assign the on-off switch “Track 1” as turntable operation to the turntable according<br />

to the image below.<br />

314<br />

Diagram 183: Assigning operations of a on-off switch to a turntable

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!