24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

operations 252<br />

<strong>and</strong> flagmen 258<br />

by routes 267<br />

in routes 254<br />

system operations 254<br />

optical sensor 127<br />

OR-group 250<br />

orientation<br />

of an engine 142<br />

passive track of a turntable 309<br />

path selection in schedules 182<br />

position<br />

display of train positions 103<br />

position control of turnouts 270<br />

power 236<br />

protection of routes 267<br />

prototypical signaling 262<br />

push button 100<br />

Railroad Clock 245<br />

ramp<br />

braking ramp 157<br />

reed contact 127<br />

Reference Indicator of Virtual Contacts<br />

279<br />

release of blocks <strong>and</strong> routes in a<br />

schedule 183<br />

reservation of blocks <strong>and</strong> routes in a<br />

schedule 180<br />

reserved block 144<br />

reversing loop 146<br />

route 265<br />

<strong>and</strong> indicators 288<br />

<strong>and</strong> protection 267<br />

<strong>and</strong> signals 267<br />

automatic route 265<br />

between blocks 140<br />

manual route 265<br />

release in a schedule 183<br />

reservation in a schedule 180<br />

start <strong>and</strong> destination key 267<br />

scale speed 111<br />

scale speed, maximum 110<br />

schedule 174<br />

aberration protection 289<br />

<strong>and</strong> timetable 297<br />

critical section 283<br />

cycle 189<br />

driving mode 189<br />

path selection 182<br />

release of blocks <strong>and</strong> routes 183<br />

reservation of blocks <strong>and</strong> routes 180<br />

sequence 194<br />

shunt 189<br />

start <strong>and</strong> destination block 175<br />

successor 194<br />

schedule diagram 174<br />

schedule selection 197<br />

schedule sequence 194<br />

schedule watchdog 289<br />

selection<br />

of a schedule 197<br />

self-provided switchboard symbol 101<br />

sensor<br />

momentary track contact 127<br />

occupancy sensor 127<br />

shifted brake or stop marker 164<br />

shifted stop, brake or speed marker<br />

158, 164<br />

shunt 189<br />

shuttle train 189<br />

signal 98<br />

<strong>and</strong> trigger 262<br />

integrated 171<br />

Signal 99<br />

signal aspect<br />

block signal 170<br />

signaling<br />

prototypical signaling 262<br />

simulated distance 111<br />

simulator 209<br />

single slip turnout 94<br />

339

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!