24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

176<br />

Diagram 117: Schedule Specific Block Settings<br />

Passage through each Block<br />

The direction, in which blocks are passed by trains running from a start to a destination<br />

block of the schedule is marked with grey <strong>and</strong> highlighted color at the exits of each<br />

block. Trains on this schedule pass each block from the grey to the highlighted exit. A<br />

train running the schedule in Diagram 116 from “Hidden Yard 3” to “Southtown 1” will<br />

pass “Main Line East”, for example, from the grey exit at the top to the highlighted exit<br />

at the bottom. Blocks, that are passed in both directions in the same schedule, are displayed<br />

with both exits highlighted. Blocks, that are not included in the schedule or that<br />

cannot be reached by a train executing this schedule, are drawn with two grey exits. If a<br />

block, that is included into your schedule, is drawn with two grey exits, then no path<br />

exists from a starting block to a destination block, that touches this block.<br />

Note that schedules can also be started to the opposite direction, i.e. from a destination<br />

block to a starting block. In such case each block is passed from the highlighted to the<br />

grey exit.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!