24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Line East” for trains that pass this block from the top to the bottom of the layout, i.e.<br />

from the Hidden Yard to Southtown. For trains running to the opposite direction this<br />

indicator reports that the train enters the block.<br />

Step 5: Creating Schedules<br />

One single schedule is sufficient to describe all train movements on the main line of the<br />

sample layout:<br />

Diagram 135: Schedule Diagram of the Sample Layout<br />

The blocks in “Hidden Yard” are marked as start blocks of the schedule. Since the<br />

schedule forms a closed loop these blocks are automatically calculated as destination<br />

blocks, too. The schedule can be started to both directions, i.e. trains can run clockwise<br />

or counter-clockwise under control of this schedule. Depending on a specific setting of<br />

this schedule, it allows either for train movements that start in Hidden Yard or for train<br />

movements that start in any other block of the main loop. All train movements will end<br />

in “Hidden Yard”, though.<br />

219

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!