24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

locked by default. This can be done by manually locking all exits manually at the beginning.<br />

Appropriate operations are assigned to the macro, that first remove the lock<br />

from the exit of the related block <strong>and</strong> then start the schedule. For example, the macro,<br />

that controls the exit from “Hidden Yard 2” to the right, executes removing the exit lock<br />

of “Hidden Yard 2” to the right plus start of the schedule. In the same way the other<br />

macros are configured, one macro for each track <strong>and</strong> each side of the “Hidden Yard”.<br />

With an appropriate operation, that restores the lock to the exits <strong>and</strong> executed by the<br />

schedule, when the block is released (see page 184), we can ensure that the exit lock of<br />

the start block is restored to the default.<br />

In the first case a route is started instead of the schedule <strong>and</strong> in the second case a macro.<br />

In either case the schedule is indirectly started by the route or the macro, respectively,<br />

by their operations. The actions performed before the schedule is actually started ensure,<br />

that the right train leaves the “Hidden Yard”.<br />

In both cases we can additionally trigger the route or the macro, respectively, by appropriate<br />

start- <strong>and</strong> destination keys (see page 267) from a switchboard or an external control<br />

panel. This provides the possibility to select the train to be started from such panel,<br />

too.<br />

Example: Hidden Yard with Train Length Control <strong>and</strong> Automatic Bypass<br />

The hidden yard displayed below will be operated automatically in the following way:<br />

Diagram 166: Hidden Yard with Train Length Control <strong>and</strong> Bypass<br />

293

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!