24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

296<br />

Diagram 170: Schedule “2A to 2B“<br />

This schedule can be linked to schedule “Exit” as a successor. In this way each train<br />

that leaves the hidden yard controlled by schedule “Exit” will try to execute schedule<br />

“2A to 2B”, when it arrives in block “Exit”. If there is a train waiting in “2A” <strong>and</strong> if<br />

“2B” is free in this moment then this train will proceed to “2B”.<br />

The two entry schedules can be linked as successors to other schedules that move a<br />

train from anywhere to block “Entry”. In the same way other schedules, that move a<br />

train from block “Exit” to anywhere can be linked as successors to schedule “Exit”. In<br />

this way the small configuration shown here can be integrated into the operation of a<br />

complete layout.<br />

In <strong>TrainController</strong> <strong>Gold</strong> extended train guidance based on train length (see page<br />

286) can be used to direct short <strong>and</strong> long trains to different tracks. We didn’t apply<br />

these possibilities here to illustrate an example, that will work in <strong>TrainController</strong><br />

<strong>Silver</strong>, too.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!