24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

X<br />

194<br />

5.14 Schedule Sequences<br />

With schedule sequences a series of schedules can be executed in <strong>TrainController</strong><br />

<strong>Gold</strong> one after the other with the same train. Schedule sequences contain a list of other<br />

schedules. When the sequence is started, then the first schedule in the list is started, too.<br />

After termination of the first schedule the second schedule in the list is started with the<br />

same train <strong>and</strong> without stopping the train, if possible. After termination of the second<br />

schedule in the sequence the third schedule is started <strong>and</strong> so on, until the last schedule<br />

in the list is completed.<br />

With schedule sequences it is possible to create long schedules by combining several<br />

shorter schedules. Sequences are for example useful to create a plurality of long schedules<br />

with a library of several short schedules as building blocks.<br />

5.15 Successors of a Schedule<br />

For each schedule it is possible to specify a set of successor schedules, one of which<br />

will be started after the schedule is finished.<br />

Several options allow you to specify how control of the train is passed from a schedule<br />

to its successor:<br />

• The successor can be selected by order or r<strong>and</strong>omly.<br />

• Additionally you can select to keep the train, i.e. to enforce that the successor continues<br />

with the same train as before, or to enforce a train change.<br />

• <strong>TrainController</strong> <strong>Gold</strong> also allows to specify a certain car, an engine or a train<br />

group. If a car or an engine is specified, then the successor is started with the engine<br />

or a train, that contains this vehicle. If a train group is specified, then the successor<br />

is started with a train, to which the train group applies (see also page 234).<br />

• It is additionally possible to specify, that the successor schedule will be started with<br />

the oldest train. The oldest train is the train, which has not been operated by a<br />

schedule for the longest time. <strong>TrainController</strong> allows you to combine this option<br />

with the other options. If this option is combined with the option to perform a train<br />

change, then the successor is started with the oldest train, that differs from the previous<br />

train. If this option is combined with the specification of a train group, then<br />

the oldest train, to which the train group applies, is started.<br />

• It is also possible to specify that all listed successors are started. These successors<br />

are started simultaneously, when the previous schedule is about to be terminated.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!