24.01.2013 Views

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

TrainController Gold and Silver - Freiwald Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

188<br />

Diagram 120: Specifications of the Section of a Schedule<br />

In the example displayed above each train entering the related block will turn on the<br />

light. Additionally it will blow its whistle when the block is released later.<br />

If a function symbol specified here is not configured for an engine, then this engine will<br />

do nothing, when it executes this schedule. If, for example, the function symbol Whistle<br />

is only assigned to steam engines in the example displayed above, then diesel engines<br />

will remain quiet when executing this schedule.<br />

These operations are specified on a per-schedule base. It is possible to specify different<br />

operations for different schedules.<br />

There are different types of schedules.<br />

Type of a Schedule - Shuttle <strong>and</strong> Cycle Trains<br />

Normally – when no special type is selected – the journey of the train ends in a destination<br />

block of the schedule.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!