26.07.2013 Views

Institut for produktion Civilingeniøruddannelsen i Byggeledelse

Institut for produktion Civilingeniøruddannelsen i Byggeledelse

Institut for produktion Civilingeniøruddannelsen i Byggeledelse

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUMMARY<br />

struction industry is currently interpreted (problem no. 7). This leads to the following<br />

goal <strong>for</strong> the thesis as a whole:<br />

SIDE 10<br />

To contribute to a change in the way the construction industry is interpreted<br />

at present. A new understanding of construction as a production should be<br />

founded holistically in a combination between the Trans<strong>for</strong>mation-Flow-<br />

Value concepts.<br />

The change in the way the construction industry is interpreted is analysed with<br />

regards to four different variables which are; Environment, Problem, Implications<br />

and Control over variables. These variables are used by Professor Richard Duke 1<br />

to decide what problem solving techniques to use in various situations. For many<br />

years Richard Duke has developed games in order to expose problems and implement<br />

solutions. Richard Duke uses the matrix shown in Figure 2 to compare<br />

gaming with other techniques <strong>for</strong> problem solving.<br />

1 Professor at University of Michigan, USA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!