SUMMARY<br />

Complete), constraint analysis and the workable backlog. The way the game is<br />

played is by having two teams play against each other. Each team consists of 2-3<br />

players. One team simulates a traditional project approach and the other team<br />

simulate a project using lean principles. The project consists of 160 Lego bricks<br />

and both teams are at best able to complete 10 activities per week – the activities<br />

being represented by Lego bricks. Drawings and a 3D model of the house are presented<br />

to the teams as shown in Figure 5. The only difference in the rules is that<br />

the team playing according to traditional building practice only has a 2 week look<br />

ahead window while the other team has a 5 week look ahead window.<br />

SIDE 14<br />

Figure 5: Drawings and a 3D model of the Lego house.<br />

Each team has a Master plan as illustrated in Figure 6 and the look ahead window<br />

is indicated as shown in the figure – here representing the situation <strong>for</strong> the team<br />

playing Last Planners.