04.08.2013 Views

Inside Pages9Final.indd - Ministry of Power

Inside Pages9Final.indd - Ministry of Power

Inside Pages9Final.indd - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

100<br />

MINISTRY OF POWER<br />

CAPACITY INDEX OF NHPC POWER STATIONS<br />

NAME OF POWER CAPACITY INDEX TOTAL<br />

STATION UP TO EXPECTED<br />

DECEMBER’ 05 CAPACITY INDEX<br />

DURING 2005-06<br />

BAIRASIUL 93.64 94.54<br />

LOKTAK 93.41 91.44<br />

SALAL , 100.00 99.43<br />

TANAKPUR 99.64 94.68<br />

CHAMERA-I 100.00 98.01<br />

URI 100.00 99.38<br />

RANGIT 96.43 93.44<br />

CHAMERA-II 97.26 95.77<br />

DHAULIGANGA 97.79 94.07<br />

TOTAL 98.71 97.46<br />

(FIGURES IN %)<br />

Note:<br />

1. CAPACITY INDEX FOR THE MONTH OF NOV’05 FOR LOKTAK POWER STATION IS SUBJECT TO CERTIFICATION<br />

BY NEREB.<br />

2. CAPACITY INDEX FOR THE MONTH OF NOV’05 FOR NORTHERN REGION POWER STATIONS ARE PROVISIONAL.<br />

3. CAPACITY INDEX TARGET FOR THE MONTH OF DEC’ 05 TO MARCH’ 06 A0S PER VERY GOOD RATING OF MOU<br />

2005-06 OF THE INDIVIDUAL POWER STATIONS.<br />

800 MW Parbati-II HE Project, (HP) - Desilting Chamber.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!