c) IT consultancy for Implementation <strong>of</strong> IT Policy at Delhi<br />

Transco<br />

d) POWERGRID implemented Video conferencing facility<br />

in the capacity <strong>of</strong> technical expert cum co-ordinator for<br />

MOP.and CPSUs under MOP.<br />

CONTRIBUTING TO DISTRIBUTION REFORMS UNDER<br />

APDRP<br />

Under Accelerated <strong>Power</strong> Development & Reform<br />

Programme (APDRP) <strong>of</strong> <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>, POWERGRID<br />

has been assigned the role <strong>of</strong> Advisor-cum-Consultant<br />

(AcC) to lend its managerial and technical expertise for<br />

developing 182 distribution circles /towns/schemes<br />

spread over 18 states and involving projects worth about<br />

Rs. 8000 Crore.<br />

In addition to the role <strong>of</strong> AcC, POWERGRID is executing<br />

APDRP schemes <strong>of</strong> about Rs. 1000 Crore on deposit work<br />

basis under bilateral arrangement in the states <strong>of</strong> Bihar, Goa,<br />

Meghalaya, Uttar Pradesh and Mizoram on turnkey basis.<br />

Further to APDRP works, POWERGRID is executing Rural<br />

Electrification works <strong>of</strong> 2400 villages in Bihar on behalf <strong>of</strong><br />

BSEB, on turnkey basis. POWERGRID entered into MoU<br />

with Rural Electrification Corporation for undertaking<br />

rural electrification works under Rajeev Gandhi Grameen<br />

Vidhyutikaran Yojana (RGGVY). Under this, POWERGRID<br />

has been assigned the job for execution <strong>of</strong> rural<br />

electrification schemes for electrifying 40,000 villages in<br />

Bihar, Orissa, West Bengal, U.P, Rajasthan, Gujarat, Assam,<br />

Tripura at an estimated cost <strong>of</strong> Rs. 3500 Crore.<br />

These are very challenging assignments for POWERGRID,<br />

it being a transmission company. However, POWERGRID<br />

has taken up the challenge in right earnest and innovative<br />

measures for the same have been adopted. Its construction<br />

being a short term activity, to avoid permanent liability<br />

<strong>of</strong> additional manpower, POWERGRID has decided to<br />

deploy existing manpower & recruited retired experienced<br />

personnel from SEBs.<br />

ENCOURAGING GRID DISCIPLINE<br />

POWERGRID, in its efforts to ensure delivery <strong>of</strong> quality<br />

power and to maintain grid discipline, implemented<br />

“Availability Based Tariff (ABT)” in all the five regions. This<br />

has stabilized the frequency to the prescribed band as per<br />

IEGC i.e. 49.0 Hz to 50.5 Hz for large percentage <strong>of</strong> time<br />

in all the five regions.<br />

MINISTRY OF POWER<br />

ABT has also encouraged inter-State and inter regional<br />

bilateral trading resulting in meeting higher demand from<br />

the existing sources. Merit order operation <strong>of</strong> generating<br />

units is gaining importance and many States are utilizing<br />

this facility to utilize the system commercially. There is<br />

overall improvement in Grid stability and partial blackouts<br />

have been drastically reduced, while it has been possible<br />

to save the grid from total blackouts.<br />

Western, Eastern & North-Eastern Regions continue to<br />

operate successfully in synchronous mode. In fact, Raipur<br />

– Rourkela 400 kV D/c line rescued Western Regional Grid<br />

in Sept’03 by importing power from Eastern Region when<br />

there was a generation loss in Western Region.<br />

Efforts made by POWERGRID in modernizing the Regional<br />

Load Despatch Centers (RLDCs), implementation <strong>of</strong><br />

Availability Based Tariff (ABT), power transfer through<br />

inter-regional links and effective Operation & Maintenance<br />

measures using State-<strong>of</strong>-the-Art technologies have led to<br />

overall improvement in power supply position in all parts<br />

<strong>of</strong> the country. It is demonstrated by the fact that there has<br />

been no major grid disturbance in any part <strong>of</strong> the country<br />

in the last 3 years. The trippings per line were lowest ever<br />

& the system availability in FY 2004-05 was as high as<br />

99.75%.<br />

With the development <strong>of</strong> vital inter-regional transmission<br />

links, surplus power <strong>of</strong> Eastern Region is being gainfully<br />

utilized by the power deficit regions. POWERGRID was<br />

able to facilitate transfer <strong>of</strong> 31,000 MU <strong>of</strong> energy across<br />

the regions during the year 2004-05, an increase <strong>of</strong> about<br />

40% compared to previous year (i.e. 22,000 MU during<br />

2003-04), which is likely to be exceeded in current financial<br />

year. Thus, inter-regional power transfer <strong>of</strong> worth Rs. 6,200<br />

Crore was facilitated, most <strong>of</strong> which would have remained<br />

bottled up but for the facilities created by POWERGRID.<br />

LEVERAGING HUMAN CAPITAL TO ACHIEVE<br />

EXCELLENCE<br />

POWERGRID believes that its human resource consisting<br />

<strong>of</strong> about 7000 employees is the most important asset<br />

and accordingly, its policies are focused on development<br />

<strong>of</strong> human potential through skill upgradation, career<br />

enhancement and job rotation to achieve organizational<br />

objectives. An effective work culture has been established<br />

in the organization through empowerment, transparency,<br />

105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!