132<br />
MINISTRY OF POWER<br />
fully Computerized Control System having state <strong>of</strong> art<br />
technology has made ready for the commissioning <strong>of</strong> the<br />
project.<br />
PROJECT COMMISSIONING:<br />
The Project is scheduled for commissioning from March<br />
2006.<br />
REVISED COST ESTIMATE:<br />
The Revised Cost Estimate <strong>of</strong> Tehri Dam & HPP Stage-I (1000<br />
MW) including essential works <strong>of</strong> Tehri PSP amounting to<br />
Rs. 6621.32 Crs including IDC & FC <strong>of</strong> Rs. 560.00 Crs.<br />
at March ’03 PL was sanctioned by CCEA in Nov.’04,<br />
with project Commissioning by July ’05. Considering the<br />
revised commissioning schedule <strong>of</strong> March’06, completion<br />
cost <strong>of</strong> the Project has been worked out tentatively to Rs.<br />
7944.32 Crs. including IDC <strong>of</strong> Rs. 1154.48 Crs.<br />
EXPENDITURE:<br />
Total expenditure incurred upto December ’05 on Tehri<br />
Stage-I Project is Rs. 7451.80 Cr. Including IDC & FC Rs.<br />
981.22 Cr.<br />
REHABILITATION:<br />
• The rehabilitation work <strong>of</strong> the project affected families<br />
was commenced by the Govt. <strong>of</strong> Uttar Pradesh when<br />
the project was under them.<br />
Tehri underground <strong>Power</strong> house<br />
• After the incorporation <strong>of</strong> Tehri Hydro Development<br />
Corporation (THDC) the rehabilitation work was handed<br />
over to the THDC in 1990. The policy as evolved by the<br />
State Govt. was fully adopted by THDC.<br />
• Improvements/Upgradation <strong>of</strong> compensations were<br />
subsequently carried out from time to time mainly to<br />
account for escalations.<br />
• A substantial package <strong>of</strong> additional measures was<br />
introduced effective from 01.09.1995.<br />
• Further improvements in R&R Policy and Package<br />
were carried out in Dec. ’98, based on decisions <strong>of</strong> the<br />
Govt. on the Recommendations <strong>of</strong> Hanumantha Rao<br />
Committee (HRC).<br />
• As per Govt. decision R&R works were transferred to the<br />
U.P. State Govt. in Jan. ’99 for implementation, under<br />
control and supervision <strong>of</strong> commissioner, Garhwal,<br />
with funds to be provided by THDC. With the formation<br />
<strong>of</strong> Uttaranchal State, R&R is now being implemented<br />
by Uttaranchal State Govt.<br />
STATUS OF REHABILITATION:<br />
Due to construction <strong>of</strong> the Tehri Dam, the Old Tehri Town<br />
and 37 villages are getting fully affected and another 72<br />
villages will only be partially affected.