24<br />

MINISTRY OF POWER<br />

Financial closure <strong>of</strong> the project was achieved in May’ 04. A<br />

debt <strong>of</strong> Rs. 980 Crore has been tied up with the consortium<br />

<strong>of</strong> multilateral and domestic financial institutions.<br />

Action has been initiated to bring in more private investment<br />

in transmission projects and two more projects. For<br />

example, transmission system associated with Koldam<br />

& Parbati-II (Estimated cost: Rs. 660 Crore) have been<br />

floated under joint venture route.<br />

Hotline maintenance <strong>of</strong> EHV line in progress<br />

In addition, some transmission lines under Western Region<br />

Strengthening scheme are envisaged to be implemented<br />

through 100% private sector participation (IPTC route).<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> is in the process <strong>of</strong> finalising policy<br />

guidelines for private investment in transmission.