92<br />
MINISTRY OF POWER<br />
Chapter - 23.2<br />
NATIONAL HYDROELECTRIC POWER<br />
CORPORATION LTD. (NHPC)<br />
NHPC is a Schedule “A” Enterprise <strong>of</strong> the Government <strong>of</strong><br />
India with an Authorized Share Capital <strong>of</strong> Rs. 15,000 Crores<br />
and an Investment base more than Rs. 22,200 Crores.<br />
It was set up in 1975, and now has become the largest<br />
organisation for Hydro <strong>Power</strong> development in India,<br />
with capabilities to undertake all the activities from<br />
conceptualization to commissioning <strong>of</strong> Hydro Projects.<br />
The main objects <strong>of</strong> NHPC includes, to plan, promote<br />
and organize an integrated and efficient development <strong>of</strong><br />
hydroelectric, Wind, Tidal and Geothermal in accordance<br />
with National Economic policy. NHPC has signed a<br />
MOU with Rural Electrification Corporation Ltd. (REC)<br />
for formulation and implementation <strong>of</strong> projects under<br />
the programme <strong>of</strong> Accelerated electrification <strong>of</strong> one lakh<br />
villages and one crore households. NHPC has also entered<br />
into an agreement with the <strong>Ministry</strong> <strong>of</strong> Rural Development<br />
for development and maintenance <strong>of</strong> rural access roads<br />
in six districts <strong>of</strong> Bihar under Pradhan Mantri Gram Sadak<br />
Yojna, a 100% Centrally Sponsored Scheme. Works are in<br />
progress on these schemes.<br />
The Corporation has following operating power stations<br />
and under-construction projects<br />
A. Operating <strong>Power</strong> stations:<br />
The Corporation has so far completed construction <strong>of</strong> 14<br />
hydroelectric projects, as under:<br />
S1. Name <strong>of</strong> the State/UT/ Installed Year <strong>of</strong><br />
No. Project Country Capacity Completion<br />
(HAW)<br />
1. BAIRASIUL H.P. 180 1981<br />
2. LOKTAK Manipur 105 1983<br />
3. SALAL STAGE-I J&K 345 1987<br />
4. TANAKPUR Uttaranchal 120 1992<br />
5. CHAMERA-I H.P. 540 1994<br />
6. SALAL STAGE-II J&K 345 1995<br />
7. URI J&K 480 1997<br />
8. RANGIT Sikkim 60 2000<br />
9. CHAMERA-II H.P. 300 2004<br />
10. DHAULIGANGA Uttaranchal 280 2005<br />
11. INDIRA SAGAR M.P. 1000 2005<br />
12. DEVIGHAT Nepal 14.10 1984<br />
13. KALPONG A&N Islands 5.25 2001<br />
14. KURICHU Bhutan 60 2002<br />
While first ten <strong>of</strong> the above mentioned projects are in<br />
the ownership <strong>of</strong> the Corporation, Indira Sagar is a Joint<br />
Venture between NHPC and Govt. <strong>of</strong> M.P. with a total<br />
installed capacity <strong>of</strong> 1000 MW from 8 units. Devighat,<br />
Kalpong & Kurichu projects were executed by NHPC on<br />
deposit work/turnkey basis and have been handed over<br />
to the owners.<br />
NHPC has generated 10655.96MUs up to 31.12.2005 and<br />
likely to generate 1582.16 MUs from remaining part <strong>of</strong><br />
financial year 2005-06 (i.e. Jan. 06 to March 06) against<br />
the annual target <strong>of</strong> 11932 MUs. The Capacity Index upto<br />
Dec. ‘05 was 98.71% against the annual target <strong>of</strong> 94.1%<br />
(details in Annex-A).<br />
UNDER CONSTRUCTION PROJECTS<br />
The Corporation is presently engaged in the construction<br />
<strong>of</strong> the following hydro projects: -<br />
Sl. Name <strong>of</strong> the Project State/UT/ Installed )<br />
No. Country Capacity (MW<br />
1. DULHASTI J&K 390<br />
2. SEWA - II J&K 120<br />
3. URI-II J&K 240<br />
4. PARBATI-II H.P. 800<br />
5. PARBATI-III H.P. 520<br />
6. CHAMERA-III H.P. 231<br />
7. TEESTA LOW DAM-HI West Bengal 132<br />
8. TEESTA LOW DAM-IV West Bengal 160<br />
9. TEESTA-V Sikkim 510<br />
10. SUBANSIRI LOWER Ar. Pradesh 2000<br />
Total 5103<br />
Joint Venture Projects<br />
11. OMKARESHWAR M.P 520<br />
Grand Total 5623<br />
The Status <strong>of</strong> On Going projects ending December<br />
2005 is given below<br />
1. Dul hasti HE Project (390 MW), J&K<br />
Excavation <strong>of</strong> Head Race Tunnel has been completed on<br />
27.08.03. 8859m (89.04%) HRT Lining has been done<br />
till Dec. 05. The balance lining work <strong>of</strong> HRT including<br />
grouting is expected to be completed by June ’06. All<br />
other works except HRT has already been completed.