AUDIT OBSERVATIONS OF C&AG<br />

MINISTRY OF POWER<br />

National Hydroelectric <strong>Power</strong> Corporation Limited<br />

The Company incurred an avoidable expenditure <strong>of</strong><br />

Rs.3.80 crore due to not carrying out overhauling <strong>of</strong> circuit<br />

breakers as per manufacturer’s maintenance manual.<br />

Besides, there was generation loss <strong>of</strong> 46.35 MUs, resulting<br />

in loss <strong>of</strong> revenue <strong>of</strong> Rs.71.39 lakh.<br />

(Para 16.1.1 <strong>of</strong> Report No. 3 <strong>of</strong> 2005) Commercial<br />

<strong>Power</strong> Grid Corporation <strong>of</strong> India Limited<br />

Failure to utilise 2,989 MT <strong>of</strong> imported steel for the past eight<br />

years resulted in locking up <strong>of</strong> borrowed funds <strong>of</strong> Rs.7.05<br />

crore and loss <strong>of</strong> interest amounting to Rs.9.03 crore.<br />

(Para 16.2.1 <strong>of</strong> Report No. 3 <strong>of</strong> 2005) Commercial<br />

<strong>Power</strong> Grid Corporation <strong>of</strong> India Limited<br />

Incorrect measurements recorded at the time <strong>of</strong><br />

construction <strong>of</strong> transmission lines resulted in overpayment<br />

<strong>of</strong> Rs. 56.18 lakh to the contractors on length-specific<br />

material.<br />

(Para 16.2.2 <strong>of</strong> Report No. 3,<strong>of</strong> 2005) Commercial<br />

Tehri Hydro Development Corporation Limited<br />

The Company paid penalty <strong>of</strong> Rs. 3.60 crore to Uttaranchal<br />

<strong>Power</strong> Corporation Limited (UPCL) during the period June<br />

1999 to June 2002 due to failure to assess its demand<br />

for power properly and delay in getting additional load<br />

sanctioned.<br />

(Para 16.3.1 <strong>of</strong> Report No. 3 <strong>of</strong> 2005) Commercial