capacity <strong>of</strong> 2146.80 MW have been completed during<br />

the Xth Plan till 31.12.2005 at an actual cost <strong>of</strong> Rs. 524.07<br />

Crores and a benefit <strong>of</strong> 259.80 MW has been achieved.<br />

c) National Perspective Plan<br />

National Perspective Plan was formulated by C.E.A<br />

in the year 2000 including the R&M proposals under<br />

Phase-II programme along with the left out schemes<br />

<strong>of</strong> the National Committee (Phase-I programme) which<br />

were under implementation/yet to be implemented at<br />

that time. This Plan indicated a benefit <strong>of</strong> about 7755<br />

MW during the IXth, Xth and XIth Plans through R&M <strong>of</strong><br />

117 schemes having an aggregate installed capacity <strong>of</strong><br />

19370 MW at an estimated cost <strong>of</strong> Rs. 4654 Crores.<br />

e) Plan-wise summary <strong>of</strong> hydro R&M schemes (as on 31.12.2005)<br />

MINISTRY OF POWER<br />

d) Revised Xth, XIth & XIIth Plan Programmes<br />

The status <strong>of</strong> hydro R&M schemes, identified by CEA<br />

under the National Perspective Plan and later on, is being<br />

regularly discussed with the concerned utilities during<br />

the annual review meetings convened by C.E.A and has<br />

been revised in totality in May/June,2005. According<br />

to the Revised Xth/XIth/XIIth Plan programme, a total <strong>of</strong><br />

47 schemes (5 in Central Sector and 42 in State Sector)<br />

are programmed for completion during the Xth Plan.<br />

59 schemes (8 in Central Sector and 51 in State Sector)<br />

are programmed for completion during the XIth Plan. 5<br />

schemes (State Sector) have been shifted to the XIIth<br />

Plan.<br />

Sl. Plan Period No.<strong>of</strong> Projects Installed Cost (Rs. in Crs.) Benefit<br />

No Capacity (MW)<br />

(MW)<br />

Central State Total Estimated Actual<br />

Sector Sector<br />

1. UptoVIIIth Plan 2 11 13 1282.00 125.57 127.37 429.00<br />

(Projects completed)<br />

2. IXth Plan 8 12 20 4892.10 597.84 570.1612 1093.03<br />

(Projects completed)<br />

3. Xth Plan<br />

i) Projects 5 42 47 7449.20 1613.48 - 1012.08<br />

programmed<br />

(Revised)<br />

ii) Projects 3 18 21 2457.75 774.09 821.7169 613.15<br />

completed<br />

iii) Projects ongoing 2 24 26 4991.45 839.39 208.691 398.93<br />

(till date)<br />

4. XIth Plan<br />

i) Projects 8 51 59 10325.40 3116.402 - 5461.18<br />

programmed(Revised)<br />

ii) Projects ongoing 3 10 13 4196.60 984.10 124.91 1625.60<br />

(till date)<br />

iii) Projects yet 5 41 46 6128.80 2132.302 - 3835.58<br />

to commence<br />

5. XIIth Plan<br />

i) Projects - 5 5 390.00 166.99 - 317.50<br />

programmed &<br />

yet to commence<br />

f) Programme for the year 2005-06<br />

As per the revised Xth Plan programme, the following 9 schemes having an aggregate installed capacity <strong>of</strong> 1761 MW, are<br />

programmed for completion during the year 2005-06 to accrue a benefit <strong>of</strong> 148 MW at an estimated cost <strong>of</strong> Rs. 269.59 Crores.<br />