Inside Pages9Final.indd - Ministry of Power
Inside Pages9Final.indd - Ministry of Power
Inside Pages9Final.indd - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
80<br />
MINISTRY OF POWER<br />
the total capacity portfolio shall comprise 48,000<br />
MW on Company’s own Balance Sheet, 6,000 MW<br />
through Joint Ventures, 1,000 MW through Domestic<br />
Subsidiaries and another 1,000 MW through Overseas<br />
Ventures. However, later the company has set for<br />
itself a revised target <strong>of</strong> 66,000 MW plus by 2017. The<br />
plan also envisages NTPC’s presence in coal mining,<br />
washeries, LNG, power distribution and trading<br />
businesses. Further, major thrust has been laid on<br />
Research & Development and integrated Enterprise<br />
Resource Planning. In essence, by 2017 NTPC aims<br />
to have presence in many countries through different<br />
business vehicles and a combined group annual<br />
turnover <strong>of</strong> Rs.1400 billion.<br />
8.1 CAPACITY ADDITION PROGRAMME : Notably, work<br />
on 8,970 MW capacity addition for benefits in X and<br />
NTPC Auraiya<br />
XI Plan is progressing concurrently. During the X Plan<br />
period, 4000 MW has already been commissioned.<br />
Construction work is going on in 8,970 MW capacity,<br />
comprising 3,710 MW due for benefits in X Plan and<br />
5,260 MW due for benefits in XI Plan. During the year<br />
2004-05, two units <strong>of</strong> 500 MW at Talcher-ll Project, one<br />
unit <strong>of</strong> 500 MW at Ramagundam-lll Project and one unit<br />
<strong>of</strong> 500 MW at Rihand-ll Project were commissioned<br />
ahead <strong>of</strong> schedule. Further, another 500 MW unit has<br />
been commissioned at Rihand-ll in September, 2005.<br />
Thus, the total generating capacity <strong>of</strong> the company has<br />
increased from 21,435 MW to 23,935 MW. In addition<br />
to this, NTPC has formed 50:50 equity participation<br />
JVs with SAIL, which consist <strong>of</strong> CPPs at Durgapur,<br />
Rourkela and Bhilai aggregating 314 MW. Thus, the<br />
total installed capacity <strong>of</strong> NTPC is 24,249 MW.