Greentech Safety Award by Greentech<br />

Foundation.<br />

> Golden Peacock Eco Innovation Award &<br />

Environment Management Award by Institute <strong>of</strong><br />

Directors.<br />

> Golden Peacock National Training Award by<br />

Institute <strong>of</strong> Directors.<br />

ANNEXURE-I<br />

DETAILS OF NTPC PROJECTS ALREADY<br />

COMMISSIONED I. COAL BASED PROJECTS<br />

S. Project State Commissioned<br />

No. Capacity (MW)<br />

1. Singrauli UP 2000<br />

2. Korba Chhattisgarh 2100<br />

3. Ramagundam AP 2600<br />

4. Farakka WB 1600<br />

5. Vindhyachal MP 2260<br />

6. Rihand UP 2000<br />

7. Kahalgaon Bihar 840<br />

8. NCTPP UP 840<br />

9. Talcher STPP Orissa 3000<br />

10. Talcher TPS Orissa 460<br />

11. Unchahar UP 840<br />

12. Simhadri AP 1000<br />

13. Tanda TPS UP 440<br />

Total (Coal) 19980<br />

Control Room <strong>of</strong> NTPC <strong>Power</strong> Plant<br />

MINISTRY OF POWER<br />

II. COMBINED CYCLE PROJECTS<br />

1. Auraiya UP 652<br />

2. Anta Raj 413<br />

3. Kawas Gujarat 645<br />

4. Dadri UP 817<br />

5. Jhanor-Gandhar Gujarat 648<br />

6. Kayamkulam Kerala 350<br />

7. Faridabad Haryana 430<br />

Total (Gas) 3955<br />

TOTAL (Coal + Gas) 23935<br />

III. CAPTIVE POWER PLANTS 314<br />

GRAND TOTAL 24249<br />

Turnover Percentage<br />

2004-05 : 0.58<br />

GRIEVANCE REDRESSAL MECHANISM IN NTPC<br />

NTPC has a public grievance redressal mechanism in place<br />

for dealing with grievances <strong>of</strong> public at large. The Company<br />

Secretariat Department is the nodal point for redressal <strong>of</strong><br />

Public Grievances and the Company Secretary has been<br />

designated as Director (Grievances) for the Corporation.<br />

Grievance Officers have also been appointed in all Projects/<br />

Regional Offices. Grievances received from the public are<br />

being processed as per guidelines issued by Department<br />

<strong>of</strong> Administrative Reforms and Public Grievances and a<br />

monthly report is furnished regularly to the Department.<br />

Grievances from employees are being dealt as per staff<br />

grievance procedure framed in this regard.<br />