B. Spillways:<br />

The Spillway arrangement consists <strong>of</strong> one Gated Chute<br />

Spillway on right bank, 2 nos ungated Shaft Spillways on<br />

Right Bank, (Shaft T-3 & T-4), 2 nos. gated Shaft Spillways<br />

on Left Bank (Shaft T-1 & T-2) and an Intermediate Level<br />

Outlet (ILO).<br />

The work <strong>of</strong> Chute Spillway and Stilling Basin has been<br />

completed. A total quantity <strong>of</strong> 8.67 Lac Cum concrete has<br />

been placed in these structures. ILO and T-3 circuit has<br />

been completed and water is flowing through the circuit.<br />

The work fo T-4 circuit is in advance stage <strong>of</strong> completion.<br />

In Shaft T-1,concrete lining from EI. 668.50 to 815.0 M and<br />

in Shaft T-2, concrete lining from EL 677.0 M to EL 815.0<br />

M has been completed till date and balance works <strong>of</strong> Left<br />

Bank Shaft Spillways are under progress.<br />

Concreting <strong>of</strong> 1st stage plug <strong>of</strong> Tunnel T-2 has been<br />

completed and works <strong>of</strong> 2nd stage plug are in progress.<br />

Closure <strong>of</strong> Tunnel-T-2:<br />

With the closure <strong>of</strong> Diversion Tunnel T-2 on 29th Oct-05,<br />

reservoir impoundment has started.<br />

View <strong>of</strong> Tehri Dam from Chute spill way<br />

C. <strong>Power</strong> House Complex:<br />

MINISTRY OF POWER<br />

i. Civil Works<br />

All the civil works <strong>of</strong> <strong>Power</strong> House Complex have been<br />

successfully completed.<br />

The work <strong>of</strong> Maintenance Gate Shaft No. 4 and its transition<br />

with HRT-4 which had become critical due to very complex<br />

geology has been successfully completed by improvised<br />

construction methodology and massive grouting.<br />

The river joining works <strong>of</strong> TRT-1 & TRT-2 which were<br />

taken-up after closure <strong>of</strong> diversion tunnel T-2 are nearing<br />

completion.<br />

ii. Electro-Mechanical Equipment:<br />

The boxing up <strong>of</strong> Unit-IV, III and II has been completed.<br />

Boxing <strong>of</strong> Unit-1 is in advance stage <strong>of</strong> completion.<br />

Erection <strong>of</strong> all 4 Nos Transformers (306 MVA each), 400<br />

KVA Gas Insulated Switchgear and Gas Insulated Busduct<br />

have also been completed. The various auxiliaries system<br />

including Governor Control Systems in the <strong>Power</strong> House<br />

have been completed and pre-commissioning <strong>of</strong> units<br />

is in progress. The <strong>Power</strong> House Control Room with<br />

131