a. Urban Displaced Families: All the 5291 Urban families<br />
<strong>of</strong> Old Tehri Town have been rehabilitated and Old Tehri<br />
Town vacated.<br />
b. Rural Displaced Families: All the Project affected<br />
families (PAFs) residing upto El. 760 m have already been<br />
rehabilitated. The balance families are being rehabilitated<br />
pari-passu with the reservoir filling.<br />
ENVIRONMENT:<br />
All the required studies have been completed and their<br />
reports submitted to the <strong>Ministry</strong> <strong>of</strong> Environment & Forests<br />
(MOEF). These studies indicated that no environmental<br />
damage would be caused by the construction <strong>of</strong> the project,<br />
which cannot be remedied by adoption <strong>of</strong> appropriate<br />
measures. For this purpose, Action Plans, wherever called<br />
for, have been/are being implemented for environmental<br />
upgradation.<br />
Catchment Area Treatment in the high and very high<br />
erodibility classification in entire area <strong>of</strong> 52,204 ha has<br />
been completed. The compensatory afforestation in an<br />
A view <strong>of</strong> part <strong>of</strong> old Tehri Town and lake reservoir<br />
MINISTRY OF POWER<br />
area <strong>of</strong> 4516 ha. has already been done in districts <strong>of</strong><br />
Jhansi and Lalitpur in U.P. The plantation done on nonforest<br />
land is being converted into protected forest by<br />
State Forest deptt.<br />
A Botanical Garden located adjacent to the Reservoir in<br />
an area <strong>of</strong> 14.28 ha at Koti in Tehri Garhwal has been set<br />
up at project cost. The work <strong>of</strong> Maheseer Fish hatchery<br />
for induced artificial breeding has been also been<br />
completed.<br />
2. KOTESHWAR HYDRO ELECTRIC PROJECT (400<br />
MW):<br />
The Koteshwar Hydro Electric Project is an integral part<br />
<strong>of</strong> the 2400 MW Tehri Hydro <strong>Power</strong> Complex. Koteshwar<br />
Project comprises a 97.5 m high concrete Dam and<br />
Surface <strong>Power</strong> House, housing 4 units <strong>of</strong> 100 MW each<br />
and is located around 22 Km. downstream <strong>of</strong> Tehri Dam.<br />
Koteshwar Project is a run-<strong>of</strong>f-river scheme with minimum<br />
diurnal storage. The Koteshwar Project will regulate water<br />
releases from Tehri Reservoir for irrigation purposes.<br />
The Govt. <strong>of</strong> India has approved the execution <strong>of</strong> Koteshwar<br />