a. Urban Displaced Families: All the 5291 Urban families<br />

<strong>of</strong> Old Tehri Town have been rehabilitated and Old Tehri<br />

Town vacated.<br />

b. Rural Displaced Families: All the Project affected<br />

families (PAFs) residing upto El. 760 m have already been<br />

rehabilitated. The balance families are being rehabilitated<br />

pari-passu with the reservoir filling.<br />

ENVIRONMENT:<br />

All the required studies have been completed and their<br />

reports submitted to the <strong>Ministry</strong> <strong>of</strong> Environment & Forests<br />

(MOEF). These studies indicated that no environmental<br />

damage would be caused by the construction <strong>of</strong> the project,<br />

which cannot be remedied by adoption <strong>of</strong> appropriate<br />

measures. For this purpose, Action Plans, wherever called<br />

for, have been/are being implemented for environmental<br />

upgradation.<br />

Catchment Area Treatment in the high and very high<br />

erodibility classification in entire area <strong>of</strong> 52,204 ha has<br />

been completed. The compensatory afforestation in an<br />

A view <strong>of</strong> part <strong>of</strong> old Tehri Town and lake reservoir<br />

MINISTRY OF POWER<br />

area <strong>of</strong> 4516 ha. has already been done in districts <strong>of</strong><br />

Jhansi and Lalitpur in U.P. The plantation done on nonforest<br />

land is being converted into protected forest by<br />

State Forest deptt.<br />

A Botanical Garden located adjacent to the Reservoir in<br />

an area <strong>of</strong> 14.28 ha at Koti in Tehri Garhwal has been set<br />

up at project cost. The work <strong>of</strong> Maheseer Fish hatchery<br />

for induced artificial breeding has been also been<br />

completed.<br />

2. KOTESHWAR HYDRO ELECTRIC PROJECT (400<br />

MW):<br />

The Koteshwar Hydro Electric Project is an integral part<br />

<strong>of</strong> the 2400 MW Tehri Hydro <strong>Power</strong> Complex. Koteshwar<br />

Project comprises a 97.5 m high concrete Dam and<br />

Surface <strong>Power</strong> House, housing 4 units <strong>of</strong> 100 MW each<br />

and is located around 22 Km. downstream <strong>of</strong> Tehri Dam.<br />

Koteshwar Project is a run-<strong>of</strong>f-river scheme with minimum<br />

diurnal storage. The Koteshwar Project will regulate water<br />

releases from Tehri Reservoir for irrigation purposes.<br />

The Govt. <strong>of</strong> India has approved the execution <strong>of</strong> Koteshwar<br />