EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />
1.12.2<br />
1.12.3<br />
1.12.4<br />
1.12.5<br />
1.12.6<br />
1.12.7<br />
Carel Van der<br />
Merwe (20)<br />
Carel Van der<br />
Merwe (20)<br />
Leon Lotter (40)<br />
E. Ley Kempthorne<br />
(49)<br />
Neville Van der<br />
Westhuizen (71)<br />
Hans Swart (27)<br />
The costs of establishing the effective and<br />
efficient access road to erf 848 or 921 are<br />
not addressed in the DEIR. Such costs<br />
should be exclusively for the developers as<br />
they will be the beneficiary of this access<br />
road, it would be unfair to impose any costs<br />
on the residents through increased rates as<br />
not all of us are in favour of this<br />
development.<br />
Costs for the facilities for buses to drop off<br />
tourists should similarly be exclusively for<br />
the developer.<br />
There is no opportunity for further<br />
development within the existing harbour due<br />
to its limited size. Should erf 848 be<br />
developed to accommodate a hotel and<br />
timeshare units, there will be no space to<br />
extend the harbour should the need arise.<br />
The possible negative impact for<br />
demand/market share of existing retail<br />
facilities in the study area has not been<br />
adequately addressed. Currently the area<br />
is very seasonal which limits the economic<br />
feasibility of too much retail. Whilst the<br />
developer has stated that the nature of his<br />
proposal are to mitigate this, it is not clear<br />
how a 60 room hotel and 27 apartments<br />
would create the estimated demand, even if<br />
100% occupancy is achieved, which is by<br />
the way debatable, and for which no<br />
indication of how this could be achieved has<br />
been provided.<br />
All along our coastline there are examples<br />
of damage to properties that encroach onto<br />
the Coastal Zone.<br />
Quality of life: Increasing numbers of nonresidents,<br />
as well as noise and disturbance<br />
due to high density accommodation<br />
CAM would be responsible for the<br />
construction of a formalized parking area with<br />
associated road and entry/exit points. The<br />
proponent would however contribute towards<br />
this infrastructure through a service<br />
agreement and agreed development levy and<br />
relevant tariffs that would apply solely to the<br />
proposed development.<br />
Please refer to point 1.12.2 of this comments<br />
and response report.<br />
Erf 848 is private land and does not form part<br />
of the harbour (in a legal context). Erf 848 is<br />
acknowledged to be within the harbour<br />
precinct and in the event that harbour<br />
expansion is required MCM would not be able<br />
to develop on Erf 848 as it is private land.<br />
Please refer to Section 2.4.6, Annexure P and<br />
Annexure U of the <strong>FEIR</strong>. This information has<br />
been produced upon request by I&APs during<br />
the public meeting conducted on the 31<br />
October 2009. Therefore, this information is<br />
new and was not originally included in the<br />
DEIR.<br />
Your concern is noted. Please refer to Section<br />
5.2.8 of the <strong>FEIR</strong>.<br />
Please refer to Section 1.7.99 of this<br />
Comment and Response Report.<br />
Cumulative<br />
impact<br />
Cumulative<br />
impact<br />
Cumulative<br />
impact<br />
Cumulative<br />
impact<br />
Cumulative<br />
impact<br />
Cumulative<br />
impact<br />
I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 107 of 193