28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

1.3.25<br />

1.3.26<br />

1.3.27<br />

1.3.28<br />

1.3.29<br />

1.3.30<br />

1.3.31<br />

1.3.32<br />

1.3.33<br />

Dirk de Jongh (Jnr)<br />

(168)<br />

Katherine C. Drake<br />

(144)<br />

Verlasety A. Meiring<br />

(136)<br />

Henri R. Du Plessis<br />

(140)<br />

Gillian Vermaak<br />

(152)<br />

Pauli Bester (132)<br />

Yvonne M Burke<br />

(166)<br />

Yvonne M Burke<br />

(166)<br />

Yvonne M Burke<br />

(166)<br />

Parking is another concern as it would<br />

congest the harbour and surrounding roads.<br />

Parking access to Erf 921 for hotel<br />

residents and restaurant patrons would<br />

reduce access for other people as well.<br />

The proposed development would result in<br />

traffic congestion<br />

Parking in the harbour and the surrounds<br />

are not addressed satisfactory in the Draft<br />

EIA<br />

I'm concerned about traffic in and out of the<br />

harbour for boat owners as well as old<br />

residents via Kusweg Oos<br />

Traffic through and around the development<br />

must be planned and controlled from the<br />

outset<br />

The proposed development will cause<br />

further traffic congestion in the harbour<br />

area.<br />

I'm concerned about traffic congestion on<br />

tourist buses and also during the<br />

construction phase on Kusweg North as<br />

we're also experiencing difficulties in getting<br />

to and from our residences during the<br />

holiday season.<br />

Kusweg North Road is not suitable for the<br />

amount of heavy traffic and with many<br />

pedestrians and children using this road<br />

could be endangered.<br />

I suggest that buses and trucks to use the<br />

Main and Harbour Roads for access to the<br />

proposed development. This matter should<br />

be discussed with the Municipality and<br />

traffic departments.<br />

Please refer to Section 5.2.2 of the <strong>FEIR</strong>.<br />

Access would be increased as there would be<br />

a number of exits on Erf 921.<br />

Please refer to Section 5.2.2 of the <strong>FEIR</strong>.<br />

Extensive assessment was undertaken to<br />

ascertain the potential impact of the proposed<br />

development to traffic flow and parking within<br />

the harbor precinct. Please note that parking<br />

within the harbor boundary is managed by the<br />

Department of Public Works.<br />

Please refer to Section 1.3.6 and 1.3.7 of this<br />

Comment and Response Report.<br />

Agreed. Please refer to Section 5.2.2 of the<br />

<strong>FEIR</strong>.<br />

Please refer to Section 5.2.2 of the <strong>FEIR</strong>.<br />

Please refer to Section 5.2.2 of the <strong>FEIR</strong> and<br />

Section 1.3.6 and 1.3.7 of this Comment and<br />

Response Report. Please refer to the<br />

construction phase impacts in Section 5.3 and<br />

refer to the EMP in Annexure Q of the <strong>FEIR</strong>.<br />

Please refer to Section 1.3.6 of this Comment<br />

and Response Report. It was stated in the<br />

EMP (Annexure Q) that the main access by<br />

construction vehicles would be Harbour Road.<br />

Your point has been noted and referred to the<br />

proponent for consideration. Please refer to<br />

Section 5.3.2 of the <strong>FEIR</strong>.<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 44 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!