28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

3.1.128<br />

3.1.129<br />

Justine Sweet (97)<br />

Justine Sweet (97)<br />

The development proponent has failed to<br />

demonstrate the sustainability and feasibility<br />

of the proposed hotel. It is submitted that<br />

there is little need for a further hotel in<br />

Struisbaai and a development which<br />

incorporates a hotel is simply not<br />

sustainable (financially or otherwise).<br />

Previously, a hotel in Struisbaai failed.<br />

Further, we point out that, despite being the<br />

developer of another proposed boutique<br />

hotel in the area, [in fact, no more than 1.5<br />

km from the site] namely at Langezandt, the<br />

development proponent has failed to<br />

mention or consider such boutique hotel.<br />

We have also been advised that a new<br />

hotel has been approved on the old<br />

Struisbaai Hotel site which would also affect<br />

the alleged feasibility of the applicant's<br />

proposed development. Significantly, we<br />

understand that although application was<br />

made for a building outside of the SDF<br />

requirements, the Department failed to<br />

approve it and that development may be<br />

constructed to a maximum height of 10m<br />

[as advised by the chairman of the<br />

Struisbaai Residents Association]. These<br />

facts are, it is submitted, material facts<br />

which ought to have been considered and<br />

disclosed [in this regard, we refer to the<br />

requirement in regulation 23(2) which<br />

requires that a development applicant place<br />

all relevant facts before the Department]<br />

and which almost certainly affect the<br />

economic feasibility of the proposed hotel.<br />

The impact of the proposed hotel on guest<br />

house operators (and their employees) has<br />

also not been adequately considered.<br />

Disagree. With reference to Section 6.1.3,<br />

Annexure P, Annexure R and Annexure U of<br />

the <strong>FEIR</strong> the proposed development has been<br />

assessed to be both financially viable<br />

(specifically Alternative 6) and confirmation<br />

has been received from CAM confirming their<br />

ability to provide services.<br />

Disagree. Please refer to Section 5.2.3 of the<br />

<strong>FEIR</strong>.<br />

Process<br />

Process<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 158 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!