28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

7.1.30<br />

7.1.31<br />

7.1.32<br />

7.1.33<br />

Meg Cowper Lewis<br />

(SEA) (48)<br />

Mike P Loubser (45)<br />

Mike P Loubser (45)<br />

David McKinstry<br />

(21)<br />

We submit images of the Struisbaai Harbour<br />

on 26 September 2009 for inclusion into this<br />

objection. It is difficult to get previous<br />

images since every time there's a big storm<br />

surge the high-water mark changes to claim<br />

more of the land. I know that the car park<br />

was completely flooded after the Tsunami<br />

but I do not have images for this. Living as I<br />

do close to the ocean I have seen high tides<br />

during the last five years that I've never<br />

witnessed before in my life. But then again,<br />

I have images from my house but not of the<br />

Struisbaai Harbour.<br />

Referring to the draft design on the DEIR, I<br />

believe that the proposed development<br />

would have a positive impact on the area<br />

and cannot find any negative aspect related<br />

to it.<br />

Currently the old Sea-fishery building at the<br />

jetty (north) is partially utilized. Should this<br />

building be used for public ablution<br />

facilitates, visitors and fishermen would<br />

have a much short distance to walk. It<br />

would also prevent people from using the<br />

adjacent bushy area as a toilet. With the<br />

approval from the Agulhas Municipality, I<br />

suggest that the public ablution facilities<br />

should be connected to the main structure<br />

of the harbour and a service plan.<br />

Further evidence of the developers real<br />

intentions is contained in the Economic<br />

Specialist report Sec 6.2 p19, The<br />

proponent is conveniently handing over the<br />

problem of the potential shutdown of<br />

Harbour Catch to MCM and the local<br />

authorities. I agree he does not have to<br />

provide this service but he does have to be<br />

limited to the activities for which the Harbour<br />

is legislated.<br />

Noted. Section 5.2.8 of the <strong>FEIR</strong> details the<br />

potential impact of sea level rise.<br />

Applicants response: Disagree, we were in<br />

the harbor at the time of the incident and did<br />

not witness a sea level rise to the degree as<br />

detailed in your comment.<br />

Noted.<br />

Thank you for the suggestion it has been<br />

forwarded to CAM and the proponent for<br />

consideration. The proposed development<br />

does make provision for ablution facilities<br />

(refer to section 2.4.8 of the <strong>FEIR</strong>) however<br />

the existing ablution facilities located on Erf<br />

921 would need to be relocated a suitable and<br />

amenable location.<br />

Regarding the fish handling facility, the<br />

architect was not mandated to design the<br />

retail section in detail. The <strong>Environmental</strong><br />

Assessment Practitioner was however<br />

informed by the proponent from the beginning<br />

that there would be a fish handling facility (fish<br />

market) and this has been conveyed to I&APs<br />

on numerous occasions.<br />

Statement<br />

Statement<br />

Statement<br />

Statement<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 182 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!