28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

3.1.145<br />

Johan Liebenberg,<br />

Dorel Van der<br />

Westhuizen, Kobus<br />

Viljoen, Abrie<br />

Bruwer, Chris Moll,<br />

Stuart Du Plessis,<br />

G. R. Youldon,<br />

Johan Venter (59,<br />

73, 69, 66, 65, 172,<br />

93, 78)<br />

It is unacceptable to state that the<br />

development will have a positive impact on<br />

the harbour. This is the last unspoilt<br />

commercial harbour in the country, where<br />

the traditional chukkies are moored without<br />

yacht marinas and constructions as<br />

proposed. It is absurd to rate this intrusion<br />

as positive. You have received over 1000<br />

complaints stating that the harbour is<br />

unspoilt and yet this has not been reflected<br />

in your Draft EIA Report.<br />

Incorrect all comments received have been<br />

included in the reports and summarized in<br />

relevant Comment Response reports. Please<br />

refer to Sections 3, 5.2.4 and 5.2.5 of the<br />

<strong>FEIR</strong>.<br />

Process<br />

3.1.146<br />

81, 79, 95, 85, 84,<br />

90, 160, 162, 164,<br />

154, 155, 156, 157,<br />

158, 153, 150, 151,<br />

116, 102, 103, 101,<br />

99, 100, 98, 92, 94,<br />

163, 174, 175, 176,<br />

177, 178, 33, 179,<br />

180, 181, 182<br />

I know of many I&APs who submitted letters<br />

of protest but are not on the database<br />

therefore we must assume their disapproval<br />

has been mislaid or lost.<br />

Please check Volume 2 of the <strong>FEIR</strong> to<br />

determine if their objection has reached<br />

Aurecon. Aurecon takes all reasonable steps<br />

to ensure the inclusion of every comment<br />

received during the EIA whether the<br />

comments are positive or negative.<br />

Process<br />

3.1.147<br />

Justine Sweet (97)<br />

The significant noise created by the<br />

fishermen, created at all times of the day<br />

and night, could pose a significant nuisance<br />

to residents and hotel guests within the<br />

proposed development [p. 141-142 of<br />

dEIR]. It is unclear whether the essential<br />

mitigation measures suggested would be<br />

sufficient to ensure that this nuisance does<br />

not result in the alienation of the fishermen<br />

as a result of persistent complaints being<br />

lodged against them. If double glazing is<br />

required to accommodate this noise<br />

concern, air conditioning would follow as a<br />

matter of course. No provision has been<br />

made for this and once again, this<br />

demonstrates a failure to consider all<br />

relevant considerations and associated<br />

impacts.<br />

EAP response: It has been stated on<br />

numerous occasions throughout the EIA that<br />

the appropriate design imperatives would be<br />

included into the construction.<br />

Stauch Vorster: Double glazing was intended<br />

from the beginning of the design stage.<br />

Noise<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 165 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!