28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

1.12.8<br />

1.12.9<br />

1.12.10<br />

Hans Swart (27)<br />

Neville Van der<br />

Westhuizen (71)<br />

Gert Groenewald,<br />

Anna-Marie<br />

Groenewald,<br />

Juliana Van der<br />

Merwe, Anneke<br />

Groenewald, Gerda<br />

Groenewald (138,<br />

138, 183, 184, 185,<br />

186)<br />

Even if I was an irregular holidaymaker, I<br />

would still object to the proposed<br />

development for many more reasons than<br />

already mentioned by other parties to<br />

Aurecon, e.g. the impact on fishing activities<br />

and Struisbaai‟s continues functioning of a<br />

fishing harbour, preservation of the harbour<br />

area as a tourist attraction, the harbour‟s<br />

authentic character of and associated<br />

cultural historic importance, etc.<br />

The true facts are conveniently omitted: i.e.<br />

that the property is situated on the high<br />

water mark and will be prone to periodic<br />

flooding. With climate change causing more<br />

severe weather patterns, storm surges<br />

would become a major concern.<br />

Negative impact with regards to pollution,<br />

natural sand dune migration, water<br />

pollution. Existing developments on the<br />

coast are causing a lot of problems and will<br />

only get worse.<br />

With regard to impact on harbour activities<br />

Please refer to Section 1.6.21 of this<br />

comments and response report. With regard<br />

to tourist attraction and character of the areas<br />

please refer to Section 5.2.3, 5.2.6 and 5.2.7<br />

of the <strong>FEIR</strong>.<br />

The water and sea levels are critical and has<br />

not been omitted. It was considered so<br />

important that specialist comment was<br />

included in the reporting on these issues.<br />

Please refer to Section 5.2.8 of the <strong>FEIR</strong>.<br />

With regard to impact on the natural<br />

environment, please refer to Section 5.2.7 of<br />

the <strong>FEIR</strong>. With regard to pollution, please<br />

refer to Section 5.2.1 of the <strong>FEIR</strong>.<br />

Cumulative<br />

impact<br />

Cumulative<br />

impact<br />

Cumulative<br />

impact<br />

1.13 Needs and desirability<br />

1.13.1<br />

1.13.2<br />

1.13.3<br />

1.13.4<br />

Marthinus Wiese<br />

(5)<br />

Carel Schaap (165)<br />

M.J Edwards (7)<br />

M.J Edwards (7)<br />

This area has no potential for more<br />

businesses.<br />

The DEIR does not adequately address the<br />

real economic impact assessment over the<br />

medium to long term. This development will<br />

stifle the harbour as a going concern for<br />

commercial fishing purposes. The impact of<br />

a dwindling fishing industry over the next<br />

couple of decades is concerning and not<br />

addressed at all.<br />

The proposed development would be an<br />

asset to Struisbaai<br />

The proposed development is protecting<br />

everybody‟s interest.<br />

Please refer to Section 5.2.3 of the <strong>FEIR</strong>.<br />

The proponent cannot take responsibility for<br />

the status of the fishing industry. Please refer<br />

to Section 1.13.26 of this Comment and<br />

Response Report regarding assisting the<br />

fisherfolk for the longer term.<br />

Your point is noted. Please refer to Section<br />

2.8 of the <strong>FEIR</strong>.<br />

Your point is noted. Please refer to Section<br />

2.8 of the <strong>FEIR</strong>.<br />

Needs &<br />

Desirability<br />

Needs and<br />

desirability<br />

Needs &<br />

Desirability<br />

Needs &<br />

Desirability<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 108 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!