28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

No<br />

Name Issue Response<br />

1 Operational phase<br />

impacts<br />

1.1 Planning concerns<br />

1.1.1<br />

1.1.2<br />

1.1.3<br />

1.1.4<br />

1.1.5<br />

Johan Van Zyl (15)<br />

Anton Louw (17)<br />

Anton Louw (17)<br />

Anton Louw (17)<br />

Emmerentia<br />

Hesseling (on<br />

behalf of 4 tax<br />

payers) (41)<br />

Successful zoning applications would result<br />

in an extension of the business area into an<br />

area that includes an ecological sensitive<br />

system.<br />

The site for the proposed development is<br />

very small for such an over-bulked<br />

development. No mention in the draft EIA<br />

report about the size (in square meters) of<br />

the proposed building.<br />

No provisions have been made for any kind<br />

of public open space on the site and such<br />

calculations don't even form part of the draft<br />

EIA report. Calculations of this nature are<br />

relevant to ascertain the density and bulk of<br />

this site.<br />

One would expect that the zoning scheme<br />

of the relevant authorities would have to<br />

form part of the draft EIA Report to see<br />

what the guidelines are for planning such<br />

development.<br />

I wish to know exactly how much support<br />

you have for this so-called “multi-level<br />

alternative”. According to my knowledge,<br />

the Struisbaai community is against the<br />

development as it would be out of place.<br />

There are no buildings higher than two<br />

storeys in Struisbaai.<br />

According the spatial development framework<br />

erf 848 is positioned in the Secondary<br />

Business Node<br />

Please refer to Section 2.4 and 2.5 of the<br />

<strong>FEIR</strong><br />

The site is private property and thus does not<br />

accommodate public open space. Please<br />

refer to Section 2.4 and 2.5 of the <strong>FEIR</strong> for<br />

bulk factor<br />

Please refer to Sections 1.3.8, 2.6 and 2.7 of<br />

the <strong>FEIR</strong><br />

Public participation processes within the<br />

environmental legislation are aimed at<br />

ensuring that issues and concerns are voiced<br />

by the interested and/or affected parties. As<br />

such, it is not a support poll for particular<br />

options or developments and frequently those<br />

in favour of a proposal will not even<br />

participate as they have no issues to raise.<br />

The multi-level alternative was the<br />

proponent‟s response to the initial issues<br />

raised by the public during the early phases of<br />

the EIA. It should be noted that the Tides has<br />

been confirmed to exceed 2 storeys.<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

Planning<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 7 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!