EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

EAP response: Thank you for your<br />

suggestion. Please refer to Section 5.2.2 of<br />

the <strong>FEIR</strong> for the revised layout. Angeled<br />

parking bays have been allowed for with the<br />

intent to accommodate vehicles and trailers.<br />

1.3.7<br />

1.3.8<br />

1.3.9<br />

Louise Louw (22)<br />

Johan van der Walt<br />

(28)<br />

Evan Meirion<br />

Williams (31)<br />

During the holiday season, the parking area<br />

(that they are planning to upgrade) is mostly<br />

used for motorboat-trailers that take a lot<br />

more space than normal vehicles. The new<br />

layout does not provide enough parking for<br />

the high number of trailers and vehicles.<br />

Concerned about the provision of a area for<br />

parking of boats and trucks in the harbour<br />

as well as the open municipal parking area.<br />

Parking access is a problem<br />

Traffic specialist (iCE Group) comment:<br />

This is a valid point. Parking bays at other<br />

harbours (Gordon‟s Bay, Yzerfontein and<br />

existing Struisbaai parking) measures<br />

between 12,5 and 13 metres in length. It is<br />

recommended that parking on the harbour<br />

land should be reserved for boats and trailers,<br />

with the second access as shown on the<br />

drawings, but also that bays on at least one<br />

row of parking on Erf 921 should be enlarged<br />

to accommodate trailers. The turning circles<br />

are being checked and will be revised if<br />

necessary.<br />

Please refer to Section 1.3.6 and 1.3.7 of this<br />

Comment and Response Report.<br />

Please refer to Sections 1.3.6 and 1.3.7 of this<br />

Comment and Response Report.<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

1.3.10<br />

1.3.11<br />

1.3.12<br />

Gerry Pienaar (38)<br />

Gerry Pienaar (38)<br />

Gerry Pienaar (38)<br />

The report is using outdated traffic<br />

information gathered in 2005 and an<br />

escalation rate of 3% per year to come to its<br />

conclusions. How can this be accurate?<br />

It is inaccurate to say that the Main Road/<br />

Malvern Drive intersection is already<br />

operating at an unacceptable service level<br />

during the holiday period<br />

Referring to Page 2 of TIA: I do not believe<br />

that statement on Struisbaai Harbour<br />

access is accurate<br />

Traffic specialists (iCE Group) comment:<br />

The traffic growth rate is the accepted<br />

standard for traffic engineers and was<br />

checked by comparing recent counts in<br />

Bredasdorp and Agulhas with the 2005<br />

counts.<br />

Traffic specialists (iCE Group) comment:<br />

We are confident that this information is<br />

sufficiently accurate for planning<br />

Traffic specialists (iCE Group) comment:<br />

We are confident that this information is<br />

sufficiently accurate for planning.<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 41 of 193