28.12.2013 Views

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

CRR IV FEIR ~ 26042010 [FINAL].pdf - Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EIA FOR THE PROPOSED LANGEZANDT QUAYS DEVELOPMENT IN STRUISBAAI HARBOUR: <strong>CRR</strong><br />

1.3.34<br />

Stephen Knobel<br />

(137)<br />

The impact of fishing activities focused on<br />

parking problems and the EIA does not<br />

address the conflict that is going to arise<br />

between the proposed development and the<br />

activities of fishermen<br />

Please refer to Section 1.3.5 of this Comment<br />

and Response Report.<br />

iCE Group comment:<br />

The Erf 848 entrance and Erf 921 parking<br />

area layout were specifically designed to<br />

relieve congestion at the harbour entrance<br />

and to provide additional parking for fisherfolk.<br />

Traffic flow &<br />

Parking<br />

1.3.35<br />

1.3.36<br />

Stephen Knobel<br />

(137)<br />

Jeanette Bruwer<br />

(75)<br />

Parking is an important issue and is<br />

covered in 20 pages of EIA. How can you<br />

iCE Group comment:<br />

even contemplate proposing less parking<br />

than the recommended national average of<br />

6 per 100 m 2<br />

Traffic flow rating reflected on the report is<br />

unreasonable. Traffic congestion is<br />

experienced everyday and with commercial<br />

and recreational fishing trailers occupying<br />

the parking space on good weather. Where<br />

would occupants and visitors of the<br />

proposed development park? Kusweg Oos<br />

and Harbour Road will change from a safe<br />

road for children and animals to a much<br />

busier road.<br />

The rate of 6 bays per 100 m 2 is used for<br />

shopping centres such as Somerset Mall or<br />

Tyger Valley. A rate of 4 bays per 100 m 2 is<br />

generally used for line shops.<br />

Please refer to Section 1.3.5 of this Comment<br />

and Response Report.<br />

Please refer to Section 1.3.5 of this Comment<br />

and Response Report.<br />

Traffic flow &<br />

Parking<br />

Traffic flow &<br />

Parking<br />

1.3.37<br />

Martoinette la<br />

Grange (86)<br />

The development will cause traffic<br />

congestion and disturb the tranquility of this<br />

holiday destination.<br />

iCE Group comment:<br />

The traffic analysis indicates that the only<br />

existing problem is at the Malvern Drive / Main<br />

Road intersection and measures were<br />

proposed (roundabout) to address this<br />

problem. The proposed Langezandt Quays<br />

development will add traffic, but intersections<br />

will continue to operate at satisfactory service<br />

levels<br />

Traffic flow &<br />

Parking<br />

I:\ENV\PROJECTS\401807~Struisbaai\Public Participation\Comments & Response\EIR\<strong>CRR</strong> <strong>IV</strong> <strong>FEIR</strong> ~ <strong>26042010</strong> [<strong>FINAL</strong>].doc 45 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!